Dropped kerbs in West Dunbartonshire

What West Dunbartonshire Council charges, its rules for driveways, and where to apply.

Application
£72.30
own contractor · 2026-27
Works licence
£142.30
own contractor · 2026-27
Min. depth
6m

Tap a figure for its source, fee year and the date we checked it.

Work out my costs

West Dunbartonshire's fees

Who builds it?
Along the kerb, including the sloping kerbs at each end. Optional.
Crossing width × pavement width, if you know it. Optional.
Anything else?

West Dunbartonshire Council

You use your own contractor

You pay at least£214.60

The council doesn't say whether VAT is included.

Plus

  • Building the dropped kerb: your contractor's price
  • Application fee
    £72.30
    • Per application (site inspections and registration)
    • VAT not stated
    west-dunbarton.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “Dimensions and details required for construction of footway crossing £72.30”
  • Works licence or permit
    £142.30
    • Week 1; £53.10 each additional week
    • VAT not stated
    • Paid by your contractor (usually passed on in their price).
    west-dunbarton.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “£142.30 week 1 £53.10 each additional week”
  • Building the dropped kerb
    Your contractor's price

Refunds

The council doesn't say whether the application fee is refunded.

Other charges the council lists

These may or may not apply to you, so they aren't in the total.

  • Road opening permit enforcement fee (private contractors)
    £116.90
    • Per permit (plus £134.50 post work inspection fee)
    • VAT not stated
    west-dunbarton.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “£116.90 (plus £134.50 post work inspection fee)”

West Dunbartonshire's rules

  • Depth of your driveway

    The council's minimum is 6m.

    The council's words
    “For single driveways they should be at least 2.75m wide and at least 6.0m long.”
    west-dunbarton.gov.uk, checked 15 November 2026

Other layout rules

Recommended single driveway width at least 2.75m (Householder Advice Note No. 2, updated August 2012; a Roads Services diagram). The footway crossing application covers kerbs only: it 'does not include permission to construct a driveway and / or a garage'; applicants should seek consent from the Planning Department, landlord and feu superior. A separate 'Dimensions for footway crossing' document is image-only and could not be read.

west-dunbarton.gov.uk, checked 15 November 2026

When the council says you need planning permission

  • New access onto a classified road or trunk road (always)
  • Tenement flat, 4-in-a-block or any other type of flat (driveway or hard surface)
  • Listed building or conservation area (driveway or hard surface)
See all 4 conditions
  • Hard surface between the house and the road that is not porous and does not drain to a permeable area within the curtilage
west-dunbarton.gov.uk, checked 15 November 2026

Check your driveway against these rules

From your house to the back of the pavement.
The same width as in the cost calculator above.
Type of crossing
Is your house on a classified road (an A, B or C road)?
Is it in a conservation area, or a listed building?

Enter your measurements to check them against West Dunbartonshire Council's rules.

  • Depth of your drivewayEnter your depth to check

    The council's minimum is 6m.

    “For single driveways they should be at least 2.75m wide and at least 6.0m long.”
    west-dunbarton.gov.uk, checked 15 November 2026
  • Classified (A, B or C) roadTell us if this applies to you
    “New access onto a classified road or trunk road (always)”
    west-dunbarton.gov.uk, checked 15 November 2026
  • Conservation area or listed buildingTell us if this applies to you
    “Listed building or conservation area (driveway or hard surface)”
    west-dunbarton.gov.uk, checked 15 November 2026

Applying to West Dunbartonshire

Who builds it
A contractor you choose builds it, with a licence from the council. Or the council builds it.
west-dunbarton.gov.uk, checked 15 November 2026
How long it takes
Not stated for the footway crossing approval. Section 56 permit: the opening must be made within ten days of issue; traffic management must be approved 7 days before works start.
west-dunbarton.gov.uk, checked 15 November 2026