Dropped kerbs in Torbay
What Torbay Council charges, its rules for driveways, and where to apply.
- Min. depth
- 6m
Tap a figure for its source, fee year and the date we checked it.
Torbay's fees
Torbay Council
A contractor you choose builds it, with a licence from the council
Total of the charges the council publishes£192.40
Uses the higher of two council figures until the council confirms.
The council doesn't say whether VAT is included.
Plus
- Building the dropped kerb: priced by quote
- Application fee£64.45 or £192.40
- The council's own pages disagree: £64.45 (fees schedule, fee year 2026-27) and £192.40 (guidance page, no fee year stated). Confirm with the council.
- The total uses the higher figure, £192.40, until the council confirms.
- Per application
torbay.gov.uk, checked 16 November 2026 · Fee year 2026-27The council's words
“crossing when works executed by applicants contractor 62.25 64.45 Traded 3.53%”
Second council source: torbay.gov.uk, checked 16 November 2026 · No fee year statedThe council's words
“The fee for a licence application is £192.40 and is payable upon submitting the application.”
- Building the dropped kerbPriced by quote
Refunds
The application fee is refunded in full if your application is refused.
The council's words
“There is a non-refundable fee of £192.40. If the licence is refused the fee will be refunded.”
Other charges the council lists
These may or may not apply to you, so they aren't in the total.
- Site visit during consideration of application£128.85
- Per visit
- No VAT
torbay.gov.uk, checked 16 November 2026 · Fee year 2026-27The council's words
“Where a site visit is required during consideration of application (per visit) 124.50 128.85 Traded 3.49%”
- Non-compliance found on inspection£128.85
- Per visit
- No VAT
torbay.gov.uk, checked 16 November 2026 · Fee year 2026-27The council's words
“Where an inspection of the site reveals non-compliance (per visit) 124.50 128.85 Traded 3.49%”
- Vehicle crossing request - works by highway authority's contractor£192.40
- Per application
- No VAT
torbay.gov.uk, checked 16 November 2026 · Fee year 2026-27The council's words
“crossing when works executed by H/A contractor 185.90 192.40 Traded 3.50%”
- Access line refresh£201.10
- Per property
- No VAT
torbay.gov.uk, checked 16 November 2026 · Fee year 2026-27The council's words
“Access Line Refresh 194.30 201.10 Traded 3.50%”
Torbay's rules
Depth of your driveway
The council's minimum is 6m.
The council's words
“There must be an area of at least 6.0m x 3.2m available for off road parking.”
torbay.gov.uk, checked 16 November 2026Minimum width
Council limit: 2.5m, the council doesn't say where it is measured.
The council's words
“Minimum Crossing Width 2.5m”
torbay.gov.uk, checked 16 November 2026
Other layout rules
Off-road parking area at least 6.0 m x 3.2 m; parking space at a right angle to the highway with the vehicle able to enter and exit in one movement. Maximum gradient for vehicle crossings 1 in 8 (footways 1 in 12); 25 mm kerb upstand for vehicle crossings. Construction type must be agreed with the council's Highways & Engineering Division before works.
Driving over the kerb without permission
Council states: 'Driving across a pavement without having a dropped kerb or crossover in place is an offence and can lead to an investigation.' Random inspections; £128.85 charge if the site does not comply with licence conditions.
When the council says you need planning permission
- Not specified: council says some dropped kerbs and crossovers require planning approval and applicants should contact the Planning department.
Check your driveway against these rules
Enter your measurements to check them against Torbay Council's rules.
- Depth of your drivewayEnter your depth to check
The council's minimum is 6m.
“There must be an area of at least 6.0m x 3.2m available for off road parking.”
torbay.gov.uk, checked 16 November 2026 - Minimum widthEnter your width to check
Council limit: 2.5m, the council doesn't say where it is measured.
“Minimum Crossing Width 2.5m”
torbay.gov.uk, checked 16 November 2026
Applying to Torbay
- Who builds it
- A contractor you choose builds it, with a licence from the counciltorbay.gov.uk, checked 16 November 2026
- How long it takes
- No decision time stated. Application, fee and documentation must be received at least ten days before the work is due to start.torbay.gov.uk, checked 16 November 2026
Sources
Every page we used from Torbay Council's website, checked on 16 November 2026.
- https://www.torbay.gov.uk/roads/highways-licenses/dropped-kerbs
- https://www.torbay.gov.uk/media/m12ph0lw/fees-and-charges-2026-27-final-4.pdf
- https://www.torbay.gov.uk/roads/access-lines/
- https://www.torbay.gov.uk/media/11515/vehicle-crossing-conditions.pdf
- https://www.torbay.gov.uk/media/11515/licence-to-excavate-the-public-highway.pdf
- https://www.torbay.gov.uk/parking/parking-permits/