Dropped kerbs in Thurrock

What Thurrock Council charges, its rules for driveways, and where to apply.

Application
£375
2026-27
Min. depth
4.8m
Max. width
4.3m
4.3m if shared

Tap a figure for its source, fee year and the date we checked it.

Work out my costs

Thurrock's fees

Along the kerb, including the sloping kerbs at each end. Optional.
Crossing width × pavement width, if you know it. Optional.
Anything else?

Thurrock Council

The council builds it

You pay at least£375

No VAT applies.

Plus

  • Building the dropped kerb: £264 per m² (add your measurements to include it)
  • Application fee
    £375
    • Per application
    • No VAT
    thurrock.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “£375 upfront;”
  • Building the dropped kerb
    £264 per m²
    • No VAT
    • Enter your area in m² to work out a price.

    Not included in the total

    thurrock.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “Cost to construct new or extension to existing domestic vehicle crossing (per square metre rate) £ 264.00”

Refunds

£300 of the application fee is refunded if your application is refused.

thurrock.gov.uk, checked 15 November 2026 · No fee year stated
The council's words
“From this amount, we will return to you: £300 if your application is refused”

Other charges the council lists

These may or may not apply to you, so they aren't in the total.

  • Amend or lower a highway gully for a new crossing
    £435
    • Per gully
    • No VAT
    thurrock.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “Cost to amend or lower a gulley in connection with the construction of a new vehicle crossing £ 420.00 O £ 435.00”
  • Extension of existing crossing to max 4.3m during Capital Footway works
    £450
    • Per crossing (Capital Footway works only)
    • No VAT
    thurrock.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “Only applicable when done in conjunction with the Capital Footway works £ 435.00 O £ 450.00”
  • New crossing at minimum width 2.7m during Capital Footway works
    £780
    • Per crossing (Capital Footway works only)
    • No VAT
    thurrock.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “A new full width crossing at the cost of £715.00, constructed to the minimum permitted £ 750.00 O £ 780.00”
  • New crossing 2.7m-4.3m wide during Capital Footway works
    £1,220
    • Per crossing (Capital Footway works only)
    • No VAT
    thurrock.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “maximum permitted width of 4.3m - Only applicable when done in £ 1,180.00 O £ 1,220.00”

Thurrock's rules

  • Depth of your driveway

    The council's minimum is 4.8m.

    The council's words
    “4.8 metres in depth”
    thurrock.gov.uk, checked 15 November 2026
  • Maximum width

    Council limit: 4.3m, measured at your property boundary.

    The council's words
    “The maximum width allowable for a crossover is 4.3m at the rear of the footway”
    thurrock.gov.uk, checked 15 November 2026
  • Minimum width

    Council limit: 2.7m, measured at your property boundary.

    The council's words
    “A crossover must be a minimum of 2.7m wide at the back of the footway.”
    thurrock.gov.uk, checked 15 November 2026
  • Minimum width

    Council limit: 4.5m, measured along the kerb.

    The council's words
    “the kerb at the front of the crossing should be at least 4.5 metres wide”
    thurrock.gov.uk, checked 15 November 2026
  • Minimum width

    Council limit: 4.3m, the council doesn't say where it is measured.

    The council's words
    “The minimum crossing width for parallel vehicle crossovers is 4.3m”
    thurrock.gov.uk, checked 15 November 2026
  • Maximum width (shared crossing)

    Council limit: 4.3m, measured at your property boundary.

    The council's words
    “the maximum to which this can be extended is 4.3m at the rear of the footway for each property”
    thurrock.gov.uk, checked 15 November 2026

Other layout rules

Hardstand min 4.8m deep x 2.4m wide (absolute min depth 4.5m if other properties in the road have off-street parking and no overhang). Parallel parking: min 2.6m depth from back of footway and 6.5m frontage width, one vehicle only. Crossing at 90 degrees within the property frontage; not on corners or junctions; not closer than 45cm to any vertical structure in the highway. Pedestrian visibility splays 1.5m x 1.5m each side, nothing over 60cm (areas page) / 1.0m (policy); carriageway setback 1.5m on 30mph roads. Hardstand gradient max 15% towards highway; footway fall max 10%. Second crossover only for in/out drives: max 2.7m wide, min 4.8m between crossings at the kerb, low parking demand. Gates must not open outwards. Footway hardened 1m either side of the crossover (accommodation works). Lay-bys may not always be approved. Hardstanding must be built before the crossing.

thurrock.gov.uk, checked 15 November 2026

Trees

No crossover where a tree would be lost or major roots damaged; root protection per BS 5837:2012, approx. no construction within 12 times the trunk diameter (measured 1.5m above ground). Trial hole at applicant's cost; removal and replacement only exceptionally with the Arboriculture team, all costs to applicant. Areas page: trees will not be removed to make space for a crossing.

thurrock.gov.uk, checked 15 November 2026

Lamp posts and street furniture

No presumption that street furniture will be relocated; if agreed, the council arranges the works before construction and invoices the applicant for all costs. Lighting column relocation needs specific permission and may make the crossover impossible. Statutory undertakers' protection works paid by applicant; utility checks can take up to 3 months.

thurrock.gov.uk, checked 15 November 2026

Driving over the kerb without permission

Unlawful and may lead to enforcement or legal action: driving across a footway or verge without an authorised crossing, creating a crossing without approval, vehicle overhanging the footway, damaging the highway through incorrect use. Overhanging the highway is an offence and enforcement action will be taken. Dropped kerbs page: 'It is illegal to cross a footway or grass verge in a vehicle to get to your property unless a proper crossing is in place.'

thurrock.gov.uk, checked 15 November 2026

When the council says you need planning permission

  • Access onto a classified road (A, B or C road)
  • Premises is a flat, house of multiple occupation or business
  • Forms part of a development that requires planning permission
See all 6 conditions
  • Within a conservation area
  • Affects the boundaries of a listed building where listed building consent is required
  • Hardstanding of more than 5 sq m of impermeable surfacing without drainage within the property
thurrock.gov.uk, checked 15 November 2026

Check your driveway against these rules

From your house to the back of the pavement.
The same width as in the cost calculator above.
Type of crossing
Is your house on a classified road (an A, B or C road)?
Is it in a conservation area, or a listed building?

Enter your measurements to check them against Thurrock Council's rules.

  • Depth of your drivewayEnter your depth to check

    The council's minimum is 4.8m.

    “4.8 metres in depth”
    thurrock.gov.uk, checked 15 November 2026
  • Maximum widthEnter your width to check

    Council limit: 4.3m, measured at your property boundary.

    “The maximum width allowable for a crossover is 4.3m at the rear of the footway”
    thurrock.gov.uk, checked 15 November 2026
  • Minimum widthEnter your width to check

    Council limit: 2.7m, measured at your property boundary.

    “A crossover must be a minimum of 2.7m wide at the back of the footway.”
    thurrock.gov.uk, checked 15 November 2026
  • Minimum widthEnter your width to check

    Council limit: 4.5m, measured along the kerb.

    “the kerb at the front of the crossing should be at least 4.5 metres wide”
    thurrock.gov.uk, checked 15 November 2026
  • Minimum widthEnter your width to check

    Council limit: 4.3m, the council doesn't say where it is measured.

    “The minimum crossing width for parallel vehicle crossovers is 4.3m”
    thurrock.gov.uk, checked 15 November 2026
  • Classified (A, B or C) roadTell us if this applies to you
    “Access onto a classified road (A, B or C road)”
    thurrock.gov.uk, checked 15 November 2026
  • Conservation area or listed buildingTell us if this applies to you
    “Within a conservation area”
    “Affects the boundaries of a listed building where listed building consent is required”
    thurrock.gov.uk, checked 15 November 2026

Applying to Thurrock

Who builds it
The council builds it
thurrock.gov.uk, checked 15 November 2026
How long it takes
No decision time stated. Utility checks can take up to 3 months. Approval valid 6 months (refund minus admin fee if construction not within 6 months). Construction generally takes up to 5 days on site.
thurrock.gov.uk, checked 15 November 2026

Apply on the council's website