Dropped kerbs in Swindon
What Swindon Borough Council charges, its rules for driveways, and where to apply.
Tap a figure for its source, fee year and the date we checked it.
Swindon's fees
Swindon Borough Council
A contractor from the council's approved list builds it
You pay at least£600
Figures include VAT.
Plus
- Building the dropped kerb: priced by quote
- Application fee£203
- Per application (residential property)
- Including VAT
ww5.swindon.gov.uk, checked 15 November 2026 · Fee year 2026-27The council's words
“StreetWorks - Highway Licensing - Drop kerbs £192.00 £203.00 01/04/2026”
- Works licence or permit£397
- Per licence
- Including VAT
- Paid by your contractor (usually passed on in their price).
ww5.swindon.gov.uk, checked 15 November 2026 · Fee year 2026-27The council's words
“StreetWorks - Highway Licensing - Section 171 £378.00 £397.00 01/04/2026”
- Building the dropped kerbPriced by quote
Refunds
The application fee is not refunded if your application is refused.
The council's words
“The application fee is non-refundable.”
Other charges the council lists
These may or may not apply to you, so they aren't in the total.
- Vehicle crossing licence - commercial property£304
- Per application (commercial property)
- Including VAT
ww5.swindon.gov.uk, checked 15 November 2026 · Fee year 2026-27The council's words
“StreetWorks - Highway Licensing - Drop kerbs £289.00 £304.00 01/04/2026”
Swindon's rules
Depth of your driveway
The council's minimum is 5m.
The council's words
“A minimum clear depth of 5.0 metres from the front of the building/bay window to the boundary at the back of the footway”
swindon.gov.uk, checked 15 November 2026Maximum width
Council limit: 5.4m, the council doesn't say where it is measured.
The council's words
“Residential crossings: 2.7–5.4 m (equivalent to 3–6 full-length kerb stones)”
swindon.gov.uk, checked 15 November 2026Minimum width
Council limit: 2.7m, the council doesn't say where it is measured.
The council's words
“Minimum residential width: 2.7 m”
swindon.gov.uk, checked 15 November 2026
Other layout rules
Driveway at least 5 m long (edge of pavement/back of footway to the property) and at least 2.5 m wide; no part of a parked vehicle may overhang the footpath; plants/structures in visibility zones below 600 mm. Commercial crossings max 6.4 m. Widening of existing crossings up to 3.6-5.4 m depending on location. Separate crossings at least 1.8-2.4 m apart and separated by at least one full kerbstone (0.915 m) or 0.8 m full-height kerb. Second crossing only on heavily trafficked roads (A/classified/traffic-sensitive) with at least 15 m depth and 20 m clear frontage width. Near junctions, tapers no closer than 10 m from the main road channel or 1.8 m from an existing pedestrian drop kerb. No crossings within lay-bys or established parking areas. Driveway surface permeable; where loose gravel is used, first 1 m behind footway (5 m on classified roads) must be hard surfaced. Drainage required so no surface water runs onto the highway. Refusal possible for poor visibility, bends/junctions/traffic lights, steep slopes. Frontages below standard may apply under special circumstances.
Trees
Healthy highway trees expected to live more than 5 years will result in refusal. Over-mature or declining trees (life expectancy 5 years or less) may be removed, with the applicant funding removal and two replacement trees. Non-mature healthy trees may be relocated or replaced at the Arboriculture Officer's discretion. Tree protection zones follow NJUG 10; trial excavations may be permitted at applicant cost.
Lamp posts and street furniture
Minimum 600 mm clearance between the crossing edge and any street furniture. Relocation may be possible at the applicant's expense (also relocation of pedestrian facilities near junctions). A street lamp or furniture in the way may be a reason for refusal.
Driving over the kerb without permission
Where vehicles access a property without an authorised vehicle crossing, the council will take enforcement action under s184 Highways Act 1980; vehicles obstructing or overhanging the highway: action under s137. The dropped kerb page also says an enforcement notice will be issued if a crossing is installed without required planning permission.
When the council says you need planning permission
- Property divided into flats
- Conservation area where a gate pillar, wall or fence over one metre high would need removing
- Structural work needed to make the parking area
See all 7 conditions
- Crossing on an A, B or C class (classified) road
- Properties where Article 4 restrictions apply
- Listed buildings or conservation areas (may require additional permissions)
- Hardstanding over 5 square metres unless permeable
Check your driveway against these rules
Enter your measurements to check them against Swindon Borough Council's rules.
- Depth of your drivewayEnter your depth to check
The council's minimum is 5m.
“A minimum clear depth of 5.0 metres from the front of the building/bay window to the boundary at the back of the footway”
swindon.gov.uk, checked 15 November 2026 - Maximum widthEnter your width to check
Council limit: 5.4m, the council doesn't say where it is measured.
“Residential crossings: 2.7–5.4 m (equivalent to 3–6 full-length kerb stones)”
swindon.gov.uk, checked 15 November 2026 - Minimum widthEnter your width to check
Council limit: 2.7m, the council doesn't say where it is measured.
“Minimum residential width: 2.7 m”
swindon.gov.uk, checked 15 November 2026 - Classified (A, B or C) roadTell us if this applies to you
“Crossing on an A, B or C class (classified) road”
swindon.gov.uk, checked 15 November 2026 - Conservation area or listed buildingTell us if this applies to you
“Conservation area where a gate pillar, wall or fence over one metre high would need removing”
“Properties where Article 4 restrictions apply”
“Listed buildings or conservation areas (may require additional permissions)”
swindon.gov.uk, checked 15 November 2026
Applying to Swindon
- Who builds it
- A contractor from the council's approved list builds itswindon.gov.uk, checked 15 November 2026
- How long it takes
- No decision time stated. Application processed after payment is received. Once the licence is confirmed the contractor must complete the work within 12 months or the resident must apply again.swindon.gov.uk, checked 15 November 2026
- Approved contractors
- The council's list
Sources
Every page we used from Swindon Borough Council's website, checked on 15 November 2026.
- https://www.swindon.gov.uk/info/20286/highway_licences_and_permits/142/apply_for_a_dropped_kerb_vehicle_crossing
- https://www.swindon.gov.uk/download/downloads/id/7695/vehicle_crossing_licence_policy.pdf
- https://ww5.swindon.gov.uk/moderngov/documents/s143831/Appendix%204%20-%20Proposed%20Fees%20and%20Charges%202026.pdf
- https://ww5.swindon.gov.uk/moderngov/documents/s144533/Budget%202026-2027.pdf
- https://www.swindon.gov.uk/info/20286/highway_licences_and_permits/75/apply_for_a_section_171_licence_to_excavate_or_place_traffic_management_on_the_highway
- https://www.swindon.gov.uk/info/20172/parking_permits/322/resident_parking_permits
- https://www.swindon.gov.uk/info/20172/parking_permits