Dropped kerbs in Sutton
What London Borough of Sutton charges, its rules for driveways, and where to apply.
Tap a figure for its source, fee year and the date we checked it.
Sutton's fees
London Borough of Sutton
The council's own contractor builds it
You pay at least£183.86
The council doesn't say whether VAT is included.
Plus
- Building the dropped kerb: no fixed price (the council only gives a guide)
- Application fee£183.86
- Per application (non-refundable inspection fee)
- VAT not stated
sutton.gov.uk, checked 15 November 2026 · No fee year statedThe council's words
“pay a non-refundable inspection fee of £183.86 to submit a dropped kerb application”
- Building the dropped kerbNot a price: the council gives an average of £1,600
- Per dropped kerb at the 4m maximum width (average)
Not included in the total
sutton.gov.uk, checked 15 November 2026 · No fee year statedThe council's words
“The maximum width for a dropped kerb is 4m, and this costs, on average, £1,600.”
Refunds
The application fee is not refunded if your application is refused.
The council's words
“pay a non-refundable inspection fee of £183.86 to submit a dropped kerb application”
Other charges the council lists
These may or may not apply to you, so they aren't in the total.
- Administration charge on works10% of total works cost
- Percentage of total works cost
- VAT not stated
sutton.gov.uk, checked 15 November 2026 · No fee year stated · Page updated 01/24The council's words
“Charges will include an administration charge of 10% of the total works cost”
Sutton's rules
Depth of your driveway
The council's minimum is 4.8m.
The council's words
“Your parking area must be at least 4.8 metres long and 2.7 metres wide.”
sutton.gov.uk, checked 15 November 2026Maximum width
Council limit: 4m, the council doesn't say where it is measured.
The council's words
“The maximum width for a dropped kerb is 4m”
sutton.gov.uk, checked 15 November 2026Minimum width
Council limit: 2.4m, measured along the kerb.
The council's words
“An opening size, minimum of 2.4m at the kerb and at the back of the footway”
sutton.gov.uk, checked 15 November 2026Minimum width
Council limit: 2.4m, measured at your property boundary.
The council's words
“An opening size, minimum of 2.4m at the kerb and at the back of the footway”
sutton.gov.uk, checked 15 November 2026
Other layout rules
Parking area at least 4.8m long and 2.7m wide (web page); the Jan 2024 policy says 4.80m by 2.40m, reducible to 4.6m deep with a 3.0m opening for echelon parking, measured from the front of any bay window; no 'short frontage' agreements. Pedestrian visibility splay 2.8m from the back of footway centrally by 3.3m along it each side, nothing over 600mm obstructing, boundary treatments no higher than 1.0m. Not within 10m of a junction or traffic signal (15m on classified roads); not within 10m of a formal pedestrian crossing, refuge, bus stop or bus cage, nor affecting zig-zags. Grass verge removal over 2.0m deep refused (1.6m in conservation areas and Local Areas of Special Character). Traffic calming features at least 2m from the start of the crossover. Ramp gradient no steeper than 1 in 12. Gates must not open outwards. Hard-standing built first, with sustainable drainage; loose surfaces need a retaining strip. Applications in a CPZ, on a red route, or on a bend/near a school crossing may be refused.
Trees
Highway trees will not be removed for a crossover. No construction within a street tree's root protection area (BS 5837:2012; guide 12 x stem diameter) and none within 1m of a trunk. Within the RPA but over 1m from the trunk, the applicant may formally request a non-refundable inspection trench at their own expense and risk. Trees on private land are referred to the Arboricultural Officer.
Lamp posts and street furniture
A crossover will not be permitted closer than 1 metre to any item of street furniture such as a lamp column or road sign. Works affecting street furniture or utility apparatus are decided with the owner and paid wholly by the applicant (e.g. moving a lighting column, sign or post, adjusting inspection covers).
Driving over the kerb without permission
Policy: driving across a footway or verge without a vehicle crossover, creating a crossover without the council's approval, overhanging the footway when parked, or damaging the crossing/footway/verge are unlawful and may result in enforcement and/or legal action. Only the council can drop kerbs; residents must not do the work themselves.
When the council says you need planning permission
- property in a conservation area
- property on a private road (planning permission instead of a dropped kerb application)
- property on a classified road (policy: A, B or C road)
See all 7 conditions
- property on a Transport for London red route
- hard-standing without sustainable drainage
- multi-dwelling property
- listed building
Check your driveway against these rules
Enter your measurements to check them against London Borough of Sutton's rules.
- Depth of your drivewayEnter your depth to check
The council's minimum is 4.8m.
“Your parking area must be at least 4.8 metres long and 2.7 metres wide.”
sutton.gov.uk, checked 15 November 2026 - Maximum widthEnter your width to check
Council limit: 4m, the council doesn't say where it is measured.
“The maximum width for a dropped kerb is 4m”
sutton.gov.uk, checked 15 November 2026 - Minimum widthEnter your width to check
Council limit: 2.4m, measured along the kerb.
“An opening size, minimum of 2.4m at the kerb and at the back of the footway”
sutton.gov.uk, checked 15 November 2026 - Minimum widthEnter your width to check
Council limit: 2.4m, measured at your property boundary.
“An opening size, minimum of 2.4m at the kerb and at the back of the footway”
sutton.gov.uk, checked 15 November 2026 - Classified (A, B or C) roadTell us if this applies to you
“property on a classified road (policy: A, B or C road)”
sutton.gov.uk, checked 15 November 2026 - Conservation area or listed buildingTell us if this applies to you
“property in a conservation area”
“listed building”
sutton.gov.uk, checked 15 November 2026
Applying to Sutton
- Who builds it
- The council's own contractor builds itsutton.gov.uk, checked 15 November 2026
- How long it takes
- Inspector visit after application and payment; once construction payment and any conditions are met, the council usually aims to complete construction within 8 weeks. Approval valid 3 years; quotations valid 3 months.sutton.gov.uk, checked 15 November 2026
Sources
Every page we used from London Borough of Sutton's website, checked on 15 November 2026.
- https://www.sutton.gov.uk/w/dropped-kerbs-for-vehicle-access
- https://www.sutton.gov.uk/streets-transport-and-parking/streets-roads-and-highways/how-apply-dropped-kerb/how-apply-dropped-kerb
- https://www.sutton.gov.uk/streets-transport-and-parking/streets-roads-and-highways/how-apply-dropped-kerb/check-if-you-can-have-dropped-kerb
- https://www.sutton.gov.uk/streets-transport-and-parking/streets-roads-and-highways/how-apply-dropped-kerb/cost-applying-dropped-kerb
- https://www.sutton.gov.uk/streets-transport-and-parking/streets-roads-and-highways/how-apply-dropped-kerb/apply-new-dropped-kerb-or-extension
- https://www.sutton.gov.uk/streets-transport-and-parking/streets-roads-and-highways/how-apply-dropped-kerb/what-happens-next
- https://www.sutton.gov.uk/sites/default/files/2026-05/LBS%20and%20RBK%20Vehicle%20Crossover%20Policy%20Jan%202024.pdf
- https://self.sutton.gov.uk/service/Apply_for_a_drop_kerb_in_Sutton
- https://sutton.gov.uk/parkingpermits
- https://www.sutton.gov.uk/-/parking-permit-fees
- https://www.sutton.gov.uk/streets-transport-and-parking/parking/parking-permits/types-parking-permits
- https://www.sutton.gov.uk/streets-transport-and-parking/parking/parking-permits/permit-parking-areas-ppas
- https://www.sutton.gov.uk/streets-transport-and-parking/parking/parking-permits/about-controlled-parking-zones-cpzs