Dropped kerbs in Suffolk
What Suffolk County Council charges, its rules for driveways, and where to apply.
- Min. depth
- 5m
Tap a figure for its source, fee year and the date we checked it.
Suffolk's fees
Suffolk County Council
A contractor you choose builds it, with a licence from the council
You pay at least£450
The council doesn't say whether VAT is included.
Plus
- Building the dropped kerb: priced by quote
- Application fee£450
- Per location
- VAT not stated
suffolk.gov.uk, checked 15 November 2026 · Fee year 2026-27The council's words
“Vehicular accesses full application per location £450.00”
- Building the dropped kerbPriced by quote
Refunds
The application fee is not refunded if your application is refused.
The council's words
“The fee is non-refundable even if the application is refused”
Other charges the council lists
These may or may not apply to you, so they aren't in the total.
- Pre-application advice£225
- Per location
- VAT not stated
suffolk.gov.uk, checked 15 November 2026 · Fee year 2026-27The council's words
“Vehicular accesses pre application advice per location £225.00”
- 12-month extension of approval£110
- Per location
- VAT not stated
suffolk.gov.uk, checked 15 November 2026 · Fee year 2026-27The council's words
“Vehicular accesses 12-month extension of approval per location £110.00”
- Access protection marking - charge to apply the marking£180
- Per marking (after approval)
- VAT not stated
suffolk.gov.uk, checked 15 November 2026 · No fee year statedThe council's words
“If your application is successful, there will be a further charge of £180 to apply the marking”
Suffolk's rules
Depth of your driveway
The council's minimum is 5m.
The council's words
“by 5 metres deep”
suffolk.gov.uk, checked 15 November 2026Maximum width (single crossing)
Council limit: 4.58m, measured along the kerb.
The council's words
“4.58 metres = 5 kerbs”
suffolk.gov.uk, checked 15 November 2026Maximum width (single crossing)
Council limit: 8.24m, measured along the kerb.
The council's words
“8.24 metres = 9 kerbs”
suffolk.gov.uk, checked 15 November 2026Maximum width (shared crossing)
Council limit: 9.15m, measured along the kerb.
The council's words
“9.15 metres = 10 kerbs”
suffolk.gov.uk, checked 15 November 2026Maximum width (shared crossing)
Council limit: 10.98m, measured along the kerb.
The council's words
“10.98 metres = 12 kerbs”
suffolk.gov.uk, checked 15 November 2026
Other layout rules
Parking space min 2.5m wide (3m between solid boundaries) x 5m deep; +1.2m depth in front of a forward-projecting garage door; non-standard depth 4.00-4.99m considered (via pre-application advice; not for new builds) with conditions recorded on land charges. 'The 5 metre rule': at least 5m between the new/extended access and the next access to protect on-street parking (not where a permanent waiting restriction applies). Junction distances and vehicle visibility splays set by figures (not in text); pedestrian splay 3.0m (1.5m either side) clear above 600mm. Second accesses discouraged; accesses in laybys refused except onto splays/tapers; parallel parking only with min 9.6m long x 3.5m deep hardstanding. Mobility scooter accesses max 1.83m dropped kerb (excluding ramped kerbs). SCC may restrict width to min 3.66m or allow slightly above the standard 4.58m. Bound surface within highway and first 5m of property; gates only if 5m from highway boundary and opening inwards; ramp gradient max 1 in 12 (footway/verge under 1.5m) or 1 in 8 (wider); sustainable drainage, no run-off onto highway; no EV cables across footway. Process covers one or two dwellings only.
Trees
May be refused if it requires removing a healthy highway tree or works within 1 metre of the trunk of a healthy highway tree. Low-amenity/unhealthy trees need pre-application advice; extra costs if the district/borough arboricultural officer is consulted; if removal agreed (SCC and LPA) applicant must fund a replacement tree away from the highway. TPO conditions must be met.
Lamp posts and street furniture
Apparatus and street furniture (poles, mains, streetlights etc.) generally within 1 metre of the proposal may be affected; applicant/contractor must contact the owner before work starts, and any moving or adjustment is arranged and paid for by the applicant.
Driving over the kerb without permission
It is an offence to carry out works within the public highway without the highway authority's permission. A dropped kerb built differently from the approval must be corrected, or Suffolk Highways will do the work and charge the applicant. Criteria: vehicles must not overhang the highway; obstructing the highway is a legal offence and enforcement action can be taken. No specific action stated for driving over a kerb without a crossover.
When the council says you need planning permission
- Leads onto an A, B or C road
- Within a Conservation Area
- Involves alterations to a listed building or walls attached to a listed building
See all 6 conditions
- Provides access to commercial or industrial premises
- Includes an area that needs paving more than 5 square metres
- Associated with other development such as new buildings, extensions or high walls
Check your driveway against these rules
Enter your measurements to check them against Suffolk County Council's rules.
- Depth of your drivewayEnter your depth to check
The council's minimum is 5m.
“by 5 metres deep”
suffolk.gov.uk, checked 15 November 2026 - Maximum width (single crossing)Enter your width to check
Council limit: 4.58m, measured along the kerb.
“4.58 metres = 5 kerbs”
suffolk.gov.uk, checked 15 November 2026 - Maximum width (single crossing)Enter your width to check
Council limit: 8.24m, measured along the kerb.
“8.24 metres = 9 kerbs”
suffolk.gov.uk, checked 15 November 2026 - Classified (A, B or C) roadTell us if this applies to you
“Leads onto an A, B or C road”
suffolk.gov.uk, checked 15 November 2026 - Conservation area or listed buildingTell us if this applies to you
“Within a Conservation Area”
“Involves alterations to a listed building or walls attached to a listed building”
suffolk.gov.uk, checked 15 November 2026
Applying to Suffolk
- Who builds it
- A contractor you choose builds it, with a licence from the councilsuffolk.gov.uk, checked 15 November 2026
- How long it takes
- Site visit and response within 20 working days; cheque payments add 7 days. Approval valid one year (extension £110). Road closures or other legal orders for the works can take a minimum of 3 months.suffolk.gov.uk, checked 15 November 2026
Sources
Every page we used from Suffolk County Council's website, checked on 15 November 2026.
- https://www.suffolk.gov.uk/roads-and-transport/parking/apply-and-pay-for-a-dropped-kerb/
- https://www.suffolk.gov.uk/roads-and-transport/highway-licences/fees-and-charges-summary
- https://www.suffolk.gov.uk/roads-and-transport/parking/apply-and-pay-for-a-dropped-kerb/dropped-kerb-criteria/
- https://www.suffolk.gov.uk/asset-library/2024-dropped-kerb-criteria.pdf
- https://www.suffolk.gov.uk/asset-library/dk-application-2024-rev.docx
- https://www.suffolk.gov.uk/roads-and-transport/parking/apply-for-access-protection-markings
- https://www.suffolk.gov.uk/roads-and-transport/parking
- https://www.suffolk.gov.uk/roads-and-transport/parking/residential-and-business-waivers
- https://www.suffolk.gov.uk/roads-and-transport/parking/residents-parking-schemes-zones