Dropped kerbs in South Ayrshire
What South Ayrshire Council charges, its rules for driveways, and where to apply.
Tap a figure for its source, fee year and the date we checked it.
South Ayrshire's fees
South Ayrshire Council
A contractor you choose builds it, with a licence from the council
You pay at least£341
The council doesn't say whether VAT is included.
Plus
- Application fee: not published by the council
- Building the dropped kerb: not published by the council
- Application feeNot published by the council
- Works licence or permit£341
- Per four weeks (Road Opening Permit, South Ayrshire)
- VAT not stated
- Paid by your contractor (usually passed on in their price).
ayrshireroadsalliance.org, checked 16 November 2026 · No fee year statedThe council's words
“Road Opening Permit (South Ayrshire) £341 every four weeks”
- Building the dropped kerbNot published by the council
Refunds
The council doesn't say whether the application fee is refunded.
South Ayrshire's rules
Depth of your driveway
The council's minimum is 5.5m.
The council's words
“Typically, this requires a minimum parking space length of 6.0m (or minimum 5.5m) measured from the back of the footway/property boundary to the front of your house or garage.”
ayrshireroadsalliance.org, checked 16 November 2026
Other layout rules
Parking area must be big enough that no part of a parked vehicle overhangs the footway or road; typically 6.0m (minimum 5.5m) from back of footway/property boundary to the house or garage. A relaxation may be considered for existing homes only, with scaled plans showing vehicles parked at an angle (perpendicular, angled or parallel) fit within the boundary; case-by-case, not for new developments or car parks/parking courts (SCOTS National Roads Development Guide applies). Access at least 10 metres from a road junction. Drivers must exit in forward gear (no reversing onto the road). If there is already an access that serves the property adequately, a second access crossing may not be permitted. EV charging equipment and charging vehicles should be at least 2.5m from electrically supplied street furniture (IET Wiring Regulations, PME separation). Application choices: new single width access, new double width access, or extend existing access (no widths stated).
Trees
The access position should ideally be altered to avoid trees; if avoiding the obstacle is not feasible, the local Roads Authority will determine whether the item should or can be removed or relocated.
Lamp posts and street furniture
The access position should ideally avoid street furniture (lighting columns, signs, utility covers); if not feasible, the local Roads Authority decides whether the item should or can be removed or relocated. The applicant pays the full cost of the dropped kerb and associated street furniture adjustments.
When the council says you need planning permission
- Footway crossing on an A, B or C class numbered road: planning permission from South Ayrshire Council (as Planning Authority) must be obtained first
Check your driveway against these rules
Enter your measurements to check them against South Ayrshire Council's rules.
- Depth of your drivewayEnter your depth to check
The council's minimum is 5.5m.
“Typically, this requires a minimum parking space length of 6.0m (or minimum 5.5m) measured from the back of the footway/property boundary to the front of your house or garage.”
ayrshireroadsalliance.org, checked 16 November 2026
Applying to South Ayrshire
- Who builds it
- A contractor you choose builds it, with a licence from the councilayrshireroadsalliance.org, checked 16 November 2026
- How long it takes
- No decision time stated for the footway crossing application (an acknowledgement is sent, then an on-site assessment). The Road Opening Permit application should be submitted at least 15 working days (21 calendar days) before the requested start date.ayrshireroadsalliance.org, checked 16 November 2026
Sources
Every page we used from South Ayrshire Council's website, checked on 16 November 2026.
- https://www.ayrshireroadsalliance.org/Apply-for/Footway-Crossing-Dropped-Kerb.aspx
- https://www.ayrshireroadsalliance.org/Developer-Business-Information/Road-Opening-Permit/Road-Opening-Permit.aspx
- https://www.ayrshireroadsalliance.org/Developer-Business-Information/Road-Opening-Permit/Road-Opening-Permit-Application.aspx
- https://ayrshireroadsalliance.org/Apply-for/H-Bar-Marking/Apply-for-an-H-bar-marking.aspx
- https://www.ayrshireroadsalliance.org/Parking-Information/Pavement-parking.aspx
- https://www.ayrshireroadsalliance.org/Parking-Information/Parking-Information.aspx
- https://www.ayrshireroadsalliance.org/Parking-Information/Residents-Parking-Permits/Residents-Parking-Permits.aspx
- https://www.ayrshireroadsalliance.org/Apply-for/Apply-for.aspx