Dropped kerbs in Rotherham

What Rotherham Metropolitan Borough Council charges, its rules for driveways, and where to apply.

Application
£143
2026-27
Building it
From £3,000

Tap a figure for its source, fee year and the date we checked it.

Work out my costs

Rotherham's fees

Along the kerb, including the sloping kerbs at each end. Optional.
Crossing width × pavement width, if you know it. Optional.
Anything else?

Rotherham Metropolitan Borough Council

A contractor you choose builds it, with a licence from the council

You pay at least£3,143

The council doesn't say whether VAT is included.

  • Application fee
    £143
    • Per licence (permanent vehicle access crossing, s184(1)(a))
    • VAT not stated
    moderngov.rotherham.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “License for the construction of permanent vehicle access crossings in the Per license 143.00”
  • Building the dropped kerb
    From £3,000
    • Per standard crossing (approx. 5 kerbs wide over a 1.8m footway), council estimate route
    • VAT not stated
    rotherham.gov.uk, checked 15 November 2026 · No fee year stated
    The council's words
    “the Council’s minimum construction fee for a standard sized crossing is £3,000.00”

Refunds

The application fee is not refunded if your application is refused.

rotherham.gov.uk, checked 15 November 2026 · No fee year stated
The council's words
“There is a standard, non-refundable charge of £143.00 for administration, inspection checking, and adoption of these works.”

Other charges the council lists

These may or may not apply to you, so they aren't in the total.

  • Temporary vehicle access crossing licence (s184(3)(a))
    £1,100
    • Per licence
    • VAT not stated
    moderngov.rotherham.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “License for the construction of temporary vehicle access crossings in the Per license 1,100.00”

Rotherham's rules

  • Depth of your driveway

    Not published by the council

Other layout rules

Suitably surfaced off-road parking area of minimum 2.5 by 5m (the page doesn't say which dimension is the depth). Hardstanding must be tarmac, concrete, block paving, or stone with at least 1 metre of hard surface directly next to the footway. May be refused for visibility, proximity to junctions or other safety concerns, or if it would contravene planning regulations. Council-owned homes need a 'Conditional approval' letter for the hardstanding/driveway.

rotherham.gov.uk, checked 15 November 2026

Trees

Application may be refused if there is a well-established tree in front of the property.

rotherham.gov.uk, checked 15 November 2026

Lamp posts and street furniture

Application may be refused if there is less than 1 metre of space on either side of a streetlight, or of a telecoms pole or cabinet.

rotherham.gov.uk, checked 15 November 2026

Driving over the kerb without permission

Council approval required to install a new dropped kerb or change/extend one; 'It is illegal to carry out highway excavations without the necessary qualifications.' No statement found on enforcement against driving over a kerb without a crossing.

rotherham.gov.uk, checked 15 November 2026

When the council says you need planning permission

  • Property on a classified A, B or C road - planning approval reference required with the application
  • Other cases may require planning permission; applicant's responsibility to obtain it before applying
rotherham.gov.uk, checked 15 November 2026

Check your driveway against these rules

From your house to the back of the pavement.
The same width as in the cost calculator above.
Type of crossing
Is your house on a classified road (an A, B or C road)?
Is it in a conservation area, or a listed building?

Rotherham Metropolitan Borough Council doesn't publish measured rules for depth or width. Ask the council before you apply.

  • Depth of your drivewayNot published by the council
  • Classified (A, B or C) roadTell us if this applies to you
    “Property on a classified A, B or C road - planning approval reference required with the application”
    rotherham.gov.uk, checked 15 November 2026

Applying to Rotherham

Who builds it
A contractor you choose builds it, with a licence from the council
rotherham.gov.uk, checked 15 November 2026
How long it takes
No decision time stated. Site inspection scheduled only once the fee is received; approvals valid 12 months from approval (new application may be needed if works not completed).
rotherham.gov.uk, checked 15 November 2026
Approved contractors
The council's list

Apply on the council's website

Sources

Every page we used from Rotherham Metropolitan Borough Council's website, checked on 15 November 2026.