Dropped kerbs in Richmond upon Thames
What London Borough of Richmond upon Thames charges, its rules for driveways, and where to apply.
- Building it
- £2,500 to £3,000
- Min. depth
- 4.8m
Tap a figure for its source, fee year and the date we checked it.
Richmond upon Thames's fees
London Borough of Richmond upon Thames
The council builds it
Total of the charges the council publishes£2,795 to £3,295
Some figures include VAT and some are before VAT.
- Application fee£295
- Per application
- No VAT
cabnet.richmond.gov.uk, checked 15 November 2026 · Fee year 2026-27The council's words
“Administration of footway crossover application by 284.00 295.00 Highways Management Group”
- Building the dropped kerb£2,500 to £3,000
- Per dropped kerb (council's stated average cost range)
- VAT not stated
richmond.gov.uk, checked 15 November 2026 · No fee year stated · Page updated 09 June 2026The council's words
“The average cost is between £2,500 and £3,000.”
Refunds
The application fee is not refunded if your application is refused.
The council's words
“The price of the application is a non-refundable charge of £295.”
Other charges the council lists
These may or may not apply to you, so they aren't in the total.
- Administration of construction of footway crossover£674.50
- Per approved crossover (included in the quote)
- No VAT
cabnet.richmond.gov.uk, checked 15 November 2026 · Fee year 2026-27The council's words
“Administration of construction of footway crossover by 650.00 674.50 Highways Management Group.”
- Renewal of existing access protection (H bar) marking£95.90
- Per renewal
- VAT not stated
cabnet.richmond.gov.uk, checked 15 November 2026 · Fee year 2026-27The council's words
“Renewal of existing 92.70 95.90”
Richmond upon Thames's rules
Depth of your driveway
The council's minimum is 4.8m.
The council's words
“the car-standing area must be a minimum size of 2.4m wide and 4.8 m long”
richmond.gov.uk, checked 15 November 2026Maximum width (single crossing)
Council limit: 2.4m, the council doesn't say where it is measured.
The council's words
“Approval, where it is given, will be for a single crossover at a width of 2.4m.”
richmond.gov.uk, checked 15 November 2026Minimum width (shared crossing)
Council limit: 2.4m, measured along the kerb.
The council's words
“the width of flat section should be between 2.4m and 4.8m”
richmond.gov.uk, checked 15 November 2026Maximum width (shared crossing)
Council limit: 4.8m, measured along the kerb.
The council's words
“the width of flat section should be between 2.4m and 4.8m”
richmond.gov.uk, checked 15 November 2026
Other layout rules
Car-standing area at least 2.4m wide and 4.8m long at 90 degrees to the footway, with a further 2.4m width; FAQ: minimum forecourt 4.8m x 4.8m. No overhang onto the pavement. Parking space not in front of the main door; a minimum 1m kept clear on one side for footway access to the front door. At least 10% soft landscaping; whole surface permeable. Gates must open inwards. Classified roads over 20mph and red routes: must enter and leave in forward gear (turning area 8.0 x 10.0m minimum). Boundary treatments in sightlines no higher than 0.6m. Not within 5.0m of a junction, within a bus cage or 5.0m of a bus stop, or within zig-zags / school keep clear markings. No net loss of on-street parking. More than 2 grouped crossovers not permitted. Refused where a grass verge 1.0m or wider would be removed. At least one-third of the boundary wall/fence retained. Garages set back at least 5.5m.
Trees
Crossover (including 0.5m taper) must not be within 4 times the circumference of a street tree once fully grown, unless the tree is dead, dying or dangerous and can be removed; where removal is agreed the applicant funds a replacement tree. If roots over 25mm are found the works may be stopped and abandoned, with construction payments (not the processing fee) refunded. Must comply with the street tree policy.
Lamp posts and street furniture
Crossovers must be at least 2.5 metres from lamp columns, telegraph poles, other street furniture and road features such as speed cushions; the cost of moving street furniture is charged to the applicant. (The older FAQ PDF says 1.5m.)
Driving over the kerb without permission
Under s184 Highways Act 1980 the council can build a crossover at the landowner's cost where a vehicle is habitually taken over the footway. The council has adopted s16 London Local Authorities and Transport for London Act 2003: it can serve notice to stop crossing a kerbed footway or verge without a crossover and, if ignored, put measures in place to prevent it; it will do so where a crossover would not be approved.
When the council says you need planning permission
- Classified road (A, B or C)
- Conservation area
- Article 4 Direction
See all 8 conditions
- Building of Townscape Merit
- Property is not a single family house (flats, bed-sits, commercial)
- Listed building
- Boundary wall, railings or fence over 1.0m next to the highway
- TfL red route (TfL deals with the crossover; planning permission from Richmond also needed)
Check your driveway against these rules
Enter your measurements to check them against London Borough of Richmond upon Thames's rules.
- Depth of your drivewayEnter your depth to check
The council's minimum is 4.8m.
“the car-standing area must be a minimum size of 2.4m wide and 4.8 m long”
richmond.gov.uk, checked 15 November 2026 - Maximum width (single crossing)Enter your width to check
Council limit: 2.4m, the council doesn't say where it is measured.
“Approval, where it is given, will be for a single crossover at a width of 2.4m.”
richmond.gov.uk, checked 15 November 2026 - Classified (A, B or C) roadTell us if this applies to you
“Classified road (A, B or C)”
richmond.gov.uk, checked 15 November 2026 - Conservation area or listed buildingTell us if this applies to you
“Conservation area”
“Article 4 Direction”
“Listed building”
richmond.gov.uk, checked 15 November 2026
Applying to Richmond upon Thames
- Who builds it
- The council builds itcabnet.richmond.gov.uk, checked 15 November 2026
- How long it takes
- Pre-assessment 4 weeks; assessment and site visit 7 working days; after payment the contractor schedules the work, which can take up to 6 weeks, with construction taking 3-5 days. Quote valid 3 months.richmond.gov.uk, checked 15 November 2026
Sources
Every page we used from London Borough of Richmond upon Thames's website, checked on 15 November 2026.
- https://www.richmond.gov.uk/dropped_kerbs
- https://www.richmond.gov.uk/services/roads_and_transport/pavements/dropped_kerbs/apply_for_a_dropped_kerb
- https://www.richmond.gov.uk/media/ocihn2wr/highways_authority_requirements.pdf
- https://www.richmond.gov.uk/media/0prbc3um/front_garden_parking_faqs.pdf
- https://www.richmond.gov.uk/services/roads_and_transport/transport_planning/request_h_bar_markings
- https://cabnet.richmond.gov.uk/documents/s500019440/TAQ%20Fees%20Charges%202026-27.pdf
- https://cabnet.richmond.gov.uk/ieListDocuments.aspx?CId=803&MId=500000534
- https://www.richmond.gov.uk/about_cpz