Dropped kerbs in Northern Ireland
What Department for Infrastructure (DfI Roads) charges, its rules for driveways, and where to apply.
- Max. width
- 5m
Tap a figure for its source, fee year and the date we checked it.
Northern Ireland's fees
Department for Infrastructure (DfI Roads)
A contractor you choose builds it, with a licence from the council
No total: the council doesn't publish these charges
Not in this total
- Application fee: not published by the council
- Building the dropped kerb: priced by quote
- Application feeNot published by the council
- Building the dropped kerbPriced by quote
Refunds
The council doesn't say whether the application fee is refunded.
Northern Ireland's rules
Depth of your driveway
Not published by the council
Minimum width (single crossing)
Council limit: 3.2m, the council doesn't say where it is measured.
The council's words
“The minimum width of a single access will normally be 3.2m with a maximum width of 5.0m.”
infrastructure-ni.gov.uk, checked 15 November 2026Maximum width (single crossing)
Council limit: 5m, the council doesn't say where it is measured.
The council's words
“The minimum width of a single access will normally be 3.2m with a maximum width of 5.0m.”
infrastructure-ni.gov.uk, checked 15 November 2026
Other layout rules
DfI considers: length and width of available hard standing for parking; visibility splays from the access; gradient of the hard standing; impact on on-street parking; impact on street trees (Article 80 form). DCAN 15: lowering of kerbs normally acceptable within development limits where there is a frontage footway; gates at least 5m from the carriageway edge where the road carries over 3000 vehicles/day, otherwise behind the visibility splay and not opening towards the carriageway; access gradient not over 8% for the first 5m; where an access crosses a footway, visibility splays 2m back into the access and 2m each side along the back of footway.
Trees
Impact on existing street trees is one of the main factors DfI considers when assessing an application. No further rule stated.
Lamp posts and street furniture
Not stated. Applicants must locate service apparatus (cables, water mains, pipes) and accept liability for damage to it.
When the council says you need planning permission
- Access onto special, trunk or other classified roads (A, B or C class) - not covered by Article 80 consent
- Residential streets in a Conservation Area or Area of Townscape Character where the planning authority confirms planning permission is required
- Commercial accesses onto any classification of road
See all 4 conditions
- Any access that is not 'permitted development' under the Planning (General Permitted Development) Order (NI) 2015 (Article 80 applies only where planning permission is not required)
Check your driveway against these rules
Enter your measurements to check them against Department for Infrastructure (DfI Roads)'s rules.
- Depth of your drivewayNot published by the council
- Minimum width (single crossing)Enter your width to check
Council limit: 3.2m, the council doesn't say where it is measured.
“The minimum width of a single access will normally be 3.2m with a maximum width of 5.0m.”
infrastructure-ni.gov.uk, checked 15 November 2026 - Maximum width (single crossing)Enter your width to check
Council limit: 5m, the council doesn't say where it is measured.
“The minimum width of a single access will normally be 3.2m with a maximum width of 5.0m.”
infrastructure-ni.gov.uk, checked 15 November 2026 - Classified (A, B or C) roadTell us if this applies to you
“Access onto special, trunk or other classified roads (A, B or C class) - not covered by Article 80 consent”
nidirect.gov.uk, checked 15 November 2026 - Conservation area or listed buildingTell us if this applies to you
“Residential streets in a Conservation Area or Area of Townscape Character where the planning authority confirms planning permission is required”
nidirect.gov.uk, checked 15 November 2026
Applying to Northern Ireland
- Who builds it
- A contractor you choose builds it, with a licence from the councilnidirect.gov.uk, checked 15 November 2026
- How long it takes
- No target stated. nidirect: 'Due to staffing issues in the Department for Infrastructure, the processing time of applications for consents and licences have been affected. You should send applications well ahead of any planned works.' Appeals to the Planning Appeals Commission within 21 days of refusal.nidirect.gov.uk, checked 15 November 2026
Sources
Every page we used from Department for Infrastructure (DfI Roads)'s website, checked on 15 November 2026.
- https://www.nidirect.gov.uk/articles/consents-and-licences-roads
- https://www.nidirect.gov.uk/publications/apply-build-or-alter-vehicular-access-dropped-kerb
- https://www.nidirect.gov.uk/sites/default/files/2024-11/application-for-vehicular-access-article-80.pdf
- https://www.infrastructure-ni.gov.uk/sites/default/files/publications/infrastructure/DCAN%2015%20-%20Vehicular%20Access%20Standards_0.pdf
- https://www.nidirect.gov.uk/articles/residents-parking-zone-permits