Dropped kerbs in Moray

What The Moray Council charges, its rules for driveways, and where to apply.

Application
£195
2026-27

Tap a figure for its source, fee year and the date we checked it.

Work out my costs

Moray's fees

Along the kerb, including the sloping kerbs at each end. Optional.
Crossing width × pavement width, if you know it. Optional.
Anything else?

The Moray Council

A contractor you choose builds it, with a licence from the council

You pay at least£195

The council doesn't say whether VAT is included.

Plus

  • Building the dropped kerb: not published by the council
  • Application fee
    £195
    • Per permit (Minor Works category)
    • VAT not stated
    moray.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “Penalty for overrun of ROP –minor works £195.00 £350.00 £923.00 £923.00”
  • Building the dropped kerb
    Not published by the council

Refunds

The council doesn't say whether the application fee is refunded.

Moray's rules

  • Depth of your driveway

    Not published by the council

Check your driveway against these rules

From your house to the back of the pavement.
The same width as in the cost calculator above.
Type of crossing
Is your house on a classified road (an A, B or C road)?
Is it in a conservation area, or a listed building?

The Moray Council doesn't publish measured rules for depth or width. Ask the council before you apply.

  • Depth of your drivewayNot published by the council

Applying to Moray

Who builds it
A contractor you choose builds it, with a licence from the council
moray.gov.uk, checked 15 November 2026
How long it takes
Notice required for a road opening permit: 7 working days (Minor Works), 11 working days (Standard Works), 3 months (Major Works).
moray.gov.uk, checked 15 November 2026
Approved contractors
The council's list

Apply on the council's website

Sources

Every page we used from The Moray Council's website, checked on 15 November 2026.