Dropped kerbs in Kingston upon Hull, City of
What Hull City Council charges, its rules for driveways, and where to apply.
Tap a figure for its source, fee year and the date we checked it.
Kingston upon Hull, City of's fees
Hull City Council
A contractor from the council's approved list builds it
You pay at least£251
The council doesn't say whether VAT is included.
Plus
- Application fee: not published by the council
- Building the dropped kerb: priced by quote
- Application feeNot published by the council
- Works licence or permit£251
- Per highway permit (vehicle crossing / excavation in the highway)
- VAT not stated
- Paid by your contractor (usually passed on in their price).
hull.gov.uk, checked 15 November 2026 · No fee year statedThe council's words
“Vehicle crossing /excavation in the Highway £251”
- Building the dropped kerbPriced by quote
Refunds
The council doesn't say whether the application fee is refunded.
Kingston upon Hull, City of's rules
Depth of your driveway
The council's minimum is 4.3m.
The council's words
“residential roads require a distance of 4.3 metres in length within your property and main roads 4.8 metres”
hull.gov.uk, checked 15 November 2026
Other layout rules
Minimum hardstanding 4.3m long x 2.4m wide on residential roads and 4.8m long x 2.4m wide on main roads, reached by crossing the footway/verge at right angles (90 degrees). Not within 10m of a junction (15m on a more important road). On classified roads, turning space within the garden is usually needed (minimum length 10.3m, minimum width 7.3m). Gates must not open outwards over the footpath or verge. A hardstanding must be built before the crossing; no water may be shed onto the highway (s163 Highways Act). Vehicles must not overhang the footpath. Access from certain listed streets is restricted (e.g. Barnes Road, Connaught Road, Runnymede Avenue). Double crossings need the neighbour's written permission. Crossings are normally tarmac; other materials may be approved.
Trees
If a council-owned tree must be removed, the highway inspector informs the chosen contractor, who contacts an Urban Forestry arboriculture inspector; the arboriculture inspector decides whether the tree can be removed. The contractor's quote covers relocation/removal of council equipment such as street trees.
Lamp posts and street furniture
The contractor's quotation covers all highway works, which could include diverting public utility equipment (telegraph poles, hydrants, etc.) and relocating or removing council equipment (street lights, street trees). Alterations to the standard crossing drawings must be agreed beforehand with a Highway Inspector.
Driving over the kerb without permission
'It is an offence to construct a domestic footpath crossing without the appropriate approval and roadworks permit. To do so may result in prosecution.' Only approved contractors may do the works. Unauthorised H bar markings are removed. Driving over a kerb without a crossing is not specifically addressed.
When the council says you need planning permission
- Crossing on a classified road (list of A, B and Class 3 roads in the information pack)
- Crossing in the Avenues/Hymers Conservation Area (information pack Step 1)
- New hard standing (from 1 October 2008) where rainwater cannot drain to soil/grass and the surface is not gravel may need planning permission
Check your driveway against these rules
Enter your measurements to check them against Hull City Council's rules.
- Depth of your drivewayEnter your depth to check
The council's minimum is 4.3m.
“residential roads require a distance of 4.3 metres in length within your property and main roads 4.8 metres”
hull.gov.uk, checked 15 November 2026 - Classified (A, B or C) roadTell us if this applies to you
“Crossing on a classified road (list of A, B and Class 3 roads in the information pack)”
hull.gov.uk, checked 15 November 2026 - Conservation area or listed buildingTell us if this applies to you
“Crossing in the Avenues/Hymers Conservation Area (information pack Step 1)”
hull.gov.uk, checked 15 November 2026
Applying to Kingston upon Hull, City of
- Who builds it
- A contractor from the council's approved list builds ithull.gov.uk, checked 15 November 2026
- How long it takes
- Highway permits page: 'All other permits take around 10 working days to process' (skip permits 3 working days). No time is stated for the contractor's quote or the works.hull.gov.uk, checked 15 November 2026
- Approved contractors
- The council's list
Sources
Every page we used from Hull City Council's website, checked on 15 November 2026.
- https://www.hull.gov.uk/roads-pavements/dropped-kerbs
- https://www.hull.gov.uk/planning-applications/dropped-kerbs
- https://www.hull.gov.uk/downloads/download/164/dropped-kerbs
- https://www.hull.gov.uk/downloads/file/4774/customer-information-pack-january-2026
- https://www.hull.gov.uk/licences-permits-registrations/highway-permits
- https://www.hull.gov.uk/parking/parking-permits
- https://www.hull.gov.uk/roads-pavements/road-markings-signs-signals
- https://www.hull.gov.uk/downloads/download/496/highway-skip-and-scaffolding-permits