Dropped kerbs in Highland

What The Highland Council charges, its rules for driveways, and where to apply.

Application
£187

Tap a figure for its source, fee year and the date we checked it.

Work out my costs

Highland's fees

Along the kerb, including the sloping kerbs at each end. Optional.
Crossing width × pavement width, if you know it. Optional.
Anything else?

The Highland Council

A contractor you choose builds it, with a licence from the council

You pay at least£187

The council doesn't say whether VAT is included.

Plus

  • Building the dropped kerb: priced by quote
  • Application fee
    £187
    • Per road opening permit (minor works, including inspection fee)
    • VAT not stated
    highland.gov.uk, checked 15 November 2026 · No fee year stated · Page updated 31 March 2026
    The council's words
    “Minor works: £187 (including inspection fee)”
  • Building the dropped kerb
    Priced by quote

Refunds

The council doesn't say whether the application fee is refunded.

Highland's rules

  • Depth of your driveway

    Not published by the council

Width, in the council's words

“Single Driveways 2700mm max. 2000 - 4200mm”
highland.gov.uk, checked 15 November 2026
“Larger Driveways 4500mm max > 4200mm”
highland.gov.uk, checked 15 November 2026

Other layout rules

Standard drawing SD/1100/07 'Typical drive footway crossing detail' (2.0m footway): single driveways (access width 'A' 2000-4200mm) drop crossing width 'W' 2700mm max; larger driveways (access > 4200mm) 4500mm max. At least the first 6 metres of the driveway must be non-loose material; gates must open inwards and not cross the footway; a drainage channel is needed where the driveway slopes towards the footway; minimum 1500mm unimpeded width for wheelchair users (else a bespoke design); dropped kerb gradient not steeper than 1 in 10 (10%); BN5 bull-nose kerbs with 25mm upstand at the carriageway edge.

highland.gov.uk, checked 15 November 2026

Driving over the kerb without permission

'Carrying out works without permission is an offence. We may remove unauthorised works and recover costs from the responsible party.' The occupying and working on public roads page also says working on the road, footway or verge without permission is an offence.

highland.gov.uk, checked 15 November 2026

Check your driveway against these rules

From your house to the back of the pavement.
The same width as in the cost calculator above.
Type of crossing
Is your house on a classified road (an A, B or C road)?
Is it in a conservation area, or a listed building?

The Highland Council doesn't publish measured rules for depth or width. Ask the council before you apply.

  • Depth of your drivewayNot published by the council

Applying to Highland

Who builds it
A contractor you choose builds it, with a licence from the council
highland.gov.uk, checked 15 November 2026
How long it takes
Applications must be submitted at least 28 days before the intended start date; the Roads Authority must give 10 working days' notice to any affected utility. Consent is valid only for the dates on the permit.
highland.gov.uk, checked 15 November 2026

Apply on the council's website

Sources

Every page we used from The Highland Council's website, checked on 15 November 2026.