Dropped kerbs in Harrow

What London Borough of Harrow charges, its rules for driveways, and where to apply.

Application
£148
2026-27
Min. depth
4.8m

Tap a figure for its source, fee year and the date we checked it.

Work out my costs

Harrow's fees

Along the kerb, including the sloping kerbs at each end. Optional.
Crossing width × pavement width, if you know it. Optional.
Anything else?

London Borough of Harrow

The council builds it

You pay at least£148

The council doesn't say whether VAT is included.

Plus

  • Building the dropped kerb: £200 to £250 per m² (add your measurements to include it)
  • Application fee
    £148
    • Per application
    • VAT not stated
    harrow.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “Standard application fee: £148.00 (non-refundable)”
  • Building the dropped kerb
    £200 to £250 per m²
    • VAT not stated
    • Enter your area in m² to work out a price.

    Not included in the total

    harrow.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “Most crossings will cost between £200.00 and £250.00 per m2”

Refunds

The application fee is not refunded if your application is refused.

harrow.gov.uk, checked 15 November 2026 · Fee year 2026-27
The council's words
“Standard application fee: £148.00 (non-refundable)”

Other charges the council lists

These may or may not apply to you, so they aren't in the total.

  • White H-bar marking application fee
    £74
    • Per H-bar application (non-refundable deposit)
    • VAT not stated
    harrow.gov.uk, checked 15 November 2026 · No fee year stated
    The council's words
    “for processing an application is £74 and this is not refundable in any instance”
  • White H-bar marking refresh (after 2-year life)
    £27.80 per metre of line
    • VAT not stated
    • Enter your crossing width to work out a price.
    harrow.gov.uk, checked 15 November 2026 · No fee year stated
    The council's words
    “The refresh fee is currently set to £27.80 per metre”
  • Service chamber adjustment: large (e.g. manhole cover)
    £71
    • Per large chamber cover in the works area
    • VAT not stated
    harrow.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “Large chamber (for example manhole cover) £71”
  • Service chamber adjustment: small (e.g. water valve cover)
    £38
    • Per small chamber cover in the works area
    • VAT not stated
    harrow.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “Small chamber (for example water valve cover) £38”
  • Tree root trial excavation
    £171.42
    • Per trial excavation
    • VAT not stated
    harrow.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “Tree root trial excavation £171.42”
  • Relocation of lamp post or street furniture
    £1,000 to £2,000
    • Per relocation
    • VAT not stated
    harrow.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “In most instances the cost will be between £1,000.00 and £2,000.00.”
  • Second and further site visitsFormula
    50% of application fee paid
    • Per second or further visit
    • VAT not stated
    harrow.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “There is an additional charge for any second and further visits this will be 50% of the application fee you paid.”

Harrow's rules

  • Depth of your driveway

    The council's minimum is 4.8m.

    The council's words
    “Your front garden must be at least 4.8 metres deep.”
    harrow.gov.uk, checked 15 November 2026
  • Minimum width

    Council limit: 2.7m, measured along the kerb.

    The council's words
    “The smallest width for a lowered kerb is 2.7 metres.”
    harrow.gov.uk, checked 15 November 2026
  • Maximum width

    Council limit: 4.5m, measured along the kerb.

    The council's words
    “The largest width for a lowered kerb is 4.5 metres, or 3.6 metres if there is a grass verge.”
    harrow.gov.uk, checked 15 November 2026
  • Maximum width

    Council limit: 3.6m, measured along the kerb.

    The council's words
    “The largest width for a lowered kerb is 4.5 metres, or 3.6 metres if there is a grass verge.”
    harrow.gov.uk, checked 15 November 2026
  • Maximum width

    Council limit: 2.7m, measured along the kerb.

    The council's words
    “The maximum section of lowered kerb permissible for a second single crossing is 2.7m”
    harrow.gov.uk, checked 15 November 2026

Width, in the council's words

“The maximum width depends on the width of your property.”
harrow.gov.uk, checked 15 November 2026
“An existing shared access (located between two properties) may be widened up to 4.5m from the mid-point (3.6m where grass verges exist).”
harrow.gov.uk, checked 15 November 2026
“Existing crossings may also be extended up to a maximum width of 4.5m of lowered kerb (3.6m where grass verges exist) along with the adjoining tapered kerb (normally 900mm in length).”
harrow.gov.uk, checked 15 November 2026
“Sloped kerbs at the edges add between 0.6 metres and 0.9 metres to the width.”
harrow.gov.uk, checked 15 November 2026
“The use of 0.6m tapered kerbs or 0.3m quadrant kerbs is not permitted on second crossings.”
harrow.gov.uk, checked 15 November 2026
“the existing footway materials and apparatus (e.g manholes/access chambers) will also influence the width of crossing permissible.”
harrow.gov.uk, checked 15 November 2026

Other layout rules

If the garden is under 4.8m deep it must fit a 5m x 2m parking bay reachable without driving over the footway and without blocking safe access to the front door; the car must not overhang the pavement. Clear view of road and pavement when driving out (no high walls/fences). At least 25% of the driveway/front garden must be permeable (permeable paving, gravel, Grasscrete or planting); gravel needs a solid front border and must be set back at least 1m. Water must not discharge onto the highway (e.g. full-width channel to a soakaway). Hard standing must meet the pavement at the same level; the council may insist on a garden wall so vehicles do not drive over the raised footway. Second crossings not permitted where they would remove healthy trees or grass verges over 1m deep (some exceptions on classified roads). Dropped kerbs are for standard cars only.

harrow.gov.uk, checked 15 November 2026

Trees

Generally a distance of four times the trunk circumference is needed between a tree and the start of the crossing; if closer you can pay for a trial excavation (£171.42). Healthy street trees are not removed and roots not pruned without the arboricultural officer's agreement. An over-mature tree (life expectancy 5 years or less) may be removed at the applicant's cost plus planting two replacement trees.

harrow.gov.uk, checked 15 November 2026

Lamp posts and street furniture

Minimum 600mm between the top of the taper (ramped kerb) and any street furniture. Relocation can sometimes be paid for (lamp post or street furniture usually £1,000 to £2,000). Utility equipment (telegraph poles, cabinets, pipes, fire hydrant valves) must be discussed with and paid to the utility company. Covers in the works area: £38 small, £71 large.

harrow.gov.uk, checked 15 November 2026

Driving over the kerb without permission

'Only contractors approved by us can carry out the work. It is against the law for anyone else to install dropped kerbs.' The Parking Management and Enforcement Strategy says it is unlawful to drive on the footway (s8.4) and that parking across a dropped kerb is a Traffic Management Act 2004 contravention.

harrow.gov.uk, checked 15 November 2026

When the council says you need planning permission

  • Flat or maisonette
  • Conservation area
  • Classified road (list of roads on the council page)
See all 4 conditions
  • Property used for business
harrow.gov.uk, checked 15 November 2026

Check your driveway against these rules

From your house to the back of the pavement.
The same width as in the cost calculator above.
Type of crossing
Is your house on a classified road (an A, B or C road)?
Is it in a conservation area, or a listed building?

Enter your measurements to check them against London Borough of Harrow's rules.

  • Depth of your drivewayEnter your depth to check

    The council's minimum is 4.8m.

    “Your front garden must be at least 4.8 metres deep.”
    harrow.gov.uk, checked 15 November 2026
  • Minimum widthEnter your width to check

    Council limit: 2.7m, measured along the kerb.

    “The smallest width for a lowered kerb is 2.7 metres.”
    harrow.gov.uk, checked 15 November 2026
  • Maximum widthEnter your width to check

    Council limit: 4.5m, measured along the kerb.

    “The largest width for a lowered kerb is 4.5 metres, or 3.6 metres if there is a grass verge.”
    harrow.gov.uk, checked 15 November 2026
  • Maximum widthEnter your width to check

    Council limit: 3.6m, measured along the kerb.

    “The largest width for a lowered kerb is 4.5 metres, or 3.6 metres if there is a grass verge.”
    harrow.gov.uk, checked 15 November 2026
  • Maximum widthEnter your width to check

    Council limit: 2.7m, measured along the kerb.

    “The maximum section of lowered kerb permissible for a second single crossing is 2.7m”
    harrow.gov.uk, checked 15 November 2026
  • Classified (A, B or C) roadTell us if this applies to you
    “Classified road (list of roads on the council page)”
    harrow.gov.uk, checked 15 November 2026
  • Conservation area or listed buildingTell us if this applies to you
    “Conservation area”
    harrow.gov.uk, checked 15 November 2026

Applying to Harrow

Who builds it
The council builds it
harrow.gov.uk, checked 15 November 2026
How long it takes
Quotation normally takes six to eight weeks after the application fee is received. Construction is batched with the council's contractor; timescale given with the quotation. H-bar applications processed within 12 weeks.
harrow.gov.uk, checked 15 November 2026

Apply on the council's website

Sources

Every page we used from London Borough of Harrow's website, checked on 15 November 2026.