Dropped kerbs in Haringey
What London Borough of Haringey charges, its rules for driveways, and where to apply.
- Building it
- £1,550 to £16,000
- Min. depth
- 4.8m
Tap a figure for its source, fee year and the date we checked it.
Haringey's fees
London Borough of Haringey
The council builds it
Total of the charges the council publishes£1,985 to £16,435
The council doesn't say whether VAT is included.
- Application fee£435
- Per application (inspection/estimate fee)
- VAT not stated
minutes.haringey.gov.uk, checked 15 November 2026 · Fee year 2026-27The council's words
“Crossovers - Inspection/Estimate Fee 416.90 435.00 18.10 Benchmarking”
- Building the dropped kerb£1,550 to £16,000
- Per crossover (estimated construction cost)
- VAT not stated
haringey.gov.uk, checked 15 November 2026 · No fee year statedThe council's words
“Lowest cost of construction £1,550 Highest cost of construction £16,000”
Refunds
The application fee is not refunded if your application is refused.
The council's words
“The fee is not refundable in any instance.”
Other charges the council lists
These may or may not apply to you, so they aren't in the total.
- Traffic order modification: second payment for parking bay removal£3,400
- Traffic order modification, stage 2
- VAT not stated
haringey.gov.uk, checked 15 November 2026 · No fee year statedThe council's words
“A further £3400 must be paid before any traffic order is proposed.”
Haringey's rules
Depth of your driveway
The council's minimum is 4.8m.
The council's words
“the minimum depth from the back of your pavement to your building line must be 4.8 metres”
haringey.gov.uk, checked 15 November 2026Minimum width
Council limit: 2.4m, the council doesn't say where it is measured.
The council's words
“The minimum width for which we can approve a crossover is 2.4 metres”
haringey.gov.uk, checked 15 November 2026Maximum width
Council limit: 4.8m, the council doesn't say where it is measured.
The council's words
“The maximum width allowed is 4.8 metres”
haringey.gov.uk, checked 15 November 2026Maximum width
Council limit: 2.4m, the council doesn't say where it is measured.
The council's words
“should be limited to a width of 2.4 metres”
haringey.gov.uk, checked 15 November 2026
Other layout rules
Minimum parking area 4.8m deep (at right angles to the footway) by 2.4m wide; vehicle must park wholly within the property at 90 degrees to the carriageway. Not within 7.5m of a junction, nor at hazardous zones (high-speed roads, signal approaches with queuing, roundabouts, cycle tracks, crossing zigzags, refuges/islands, bus stops). A second crossover only if frontage over 9m, low kerbside parking demand, no loss of street tree/shrub verge, and at least 1.2m of footway between crossovers. No direct crossover onto a principal/classified road where rear or side access exists. Hard standing must not be directly in front of the front door, must be built before the crossover, and gates must not open outwards. Adequate surface water drainage required (gully relocation charged). Light, medium and heavy duty crossovers (heavy duty for vehicles over 3,500kg, flats and commercial).
Trees
All crossovers near a tree are referred to the Tree Section to decide whether the tree is affected and whether it can be removed; if tree removal is refused the crossover is not approved. NJUG guidance: precautions within 4 times the trunk circumference. Costs of removing/replacing highway amenity are borne by the applicant.
Lamp posts and street furniture
Normally a minimum of 1.2 metres between a proposed crossover and existing street furniture (lamp columns, signs). Removal/replacement of street furniture is at the applicant's cost. Utility covers need clearance from the utility, which charges for relocating/strengthening apparatus; the engineer inspection may identify utilities you must arrange and pay to move.
Driving over the kerb without permission
Under the Highways Act 1980 you must have a dropped kerb to drive over a pavement to park in your driveway. Guidance 1(b): a vehicle overhanging the footway may cause an obstruction, an offence under the Highways Act 1980; non-compliance 'can result in enforcement action and removal of the crossover'.
When the council says you need planning permission
- Crossover directly on a classified road
- Listed building
- Property is not a house (flat, maisonette or commercial premises)
See all 7 conditions
- Proposed hard standing more than 5 square metres of non-permeable surface
- Conservation area and work includes removing a front wall higher than 1 metre
- Conservation area with an Article 4 direction
- Access likely to affect a tree protected by a Tree Preservation Order (guidance notes)
Check your driveway against these rules
Enter your measurements to check them against London Borough of Haringey's rules.
- Depth of your drivewayEnter your depth to check
The council's minimum is 4.8m.
“the minimum depth from the back of your pavement to your building line must be 4.8 metres”
haringey.gov.uk, checked 15 November 2026 - Minimum widthEnter your width to check
Council limit: 2.4m, the council doesn't say where it is measured.
“The minimum width for which we can approve a crossover is 2.4 metres”
haringey.gov.uk, checked 15 November 2026 - Maximum widthEnter your width to check
Council limit: 4.8m, the council doesn't say where it is measured.
“The maximum width allowed is 4.8 metres”
haringey.gov.uk, checked 15 November 2026 - Maximum widthEnter your width to check
Council limit: 2.4m, the council doesn't say where it is measured.
“should be limited to a width of 2.4 metres”
haringey.gov.uk, checked 15 November 2026 - Classified (A, B or C) roadTell us if this applies to you
“Crossover directly on a classified road”
haringey.gov.uk, checked 15 November 2026 - Conservation area or listed buildingTell us if this applies to you
“Listed building”
“Conservation area and work includes removing a front wall higher than 1 metre”
“Conservation area with an Article 4 direction”
haringey.gov.uk, checked 15 November 2026
Applying to Haringey
- Who builds it
- The council builds itharingey.gov.uk, checked 15 November 2026
- How long it takes
- 'The council will endeavour to deal with your application within 6 weeks of receipt', longer where street trees, lamp columns or utility plant are involved.haringey.gov.uk, checked 15 November 2026
Sources
Every page we used from London Borough of Haringey's website, checked on 15 November 2026.
- https://haringey.gov.uk/streets-roads-travel/street-licences-applications/dropped-kerbs
- https://haringey.gov.uk/streets-roads-travel/street-licences-applications/dropped-kerbs/dropped-kerb-construction
- https://haringey.gov.uk/streets-roads-travel/street-licences-applications/dropped-kerbs/dropped-kerb-planning-permission
- https://haringey.gov.uk/sites/default/files/2023-06/vehicle_crossover_guidelines.pdf
- https://www.minutes.haringey.gov.uk/documents/s155008/Appendix%20II.%20Highways%20and%20Parking%202026-27.pdf
- https://www.minutes.haringey.gov.uk/documents/s155030/Final%20Fees%20and%20Charges%20202627_Cabinet.pdf
- https://haringey.gov.uk/parking/parking-permits
- https://haringey.gov.uk/parking/where-you-can-park-haringey