Dropped kerbs in Hammersmith and Fulham
What London Borough of Hammersmith & Fulham charges, its rules for driveways, and where to apply.
- Min. depth
- 4.8m
Tap a figure for its source, fee year and the date we checked it.
Hammersmith and Fulham's fees
London Borough of Hammersmith & Fulham
The council's own contractor builds it
You pay at least£660
The council doesn't say whether VAT is included.
Plus
- Building the dropped kerb: priced by quote
- Application fee£660
- Per application
- VAT not stated
democracy.lbhf.gov.uk, checked 16 November 2026 · Fee year 2026-27The council's words
“Crossover Application fee | £600.00 | £660.00 | £60.00”
- Building the dropped kerbPriced by quote
- The council's estimate for the works already includes the £660 application fee, so don't add the £660 on top of it. The council's crossover page says: "This estimate will include an allowance for possible difficulties and a non-refundable application fee of £660 to cover the cost to us of processing your application, supervising and paying for the necessary construction works." The estimate is based on the council's agreed contractor rates, and you pay what the council actually pays its contractor. Estimates are valid for 60 days.
Refunds
The application fee is not refunded if your application is refused.
The council's words
“This estimate will include an allowance for possible difficulties and a non-refundable application fee of £660 to cover the cost to us of processing your application, supervising and paying for the necessary construction works. This application fee is to be paid whether or not your application is successful”
Other charges the council lists
These may or may not apply to you, so they aren't in the total.
- Trial hole£400
- Per trial hole
- VAT not stated
lbhf.gov.uk, checked 16 November 2026 · No fee year statedThe council's words
“The cost of a trial hole is £400 (subject to change) which will be deducted from the final cost.”
- Relocating a lamp column (rough cost)Not a price: the council's rough guide is about £3,500
- Per lamp column
lbhf.gov.uk, checked 16 November 2026 · No fee year statedThe council's words
“rough cost for relocating a column is £3,500”
Hammersmith and Fulham's rules
Depth of your driveway
The council's minimum is 4.8m.
The council's words
“the area on which the vehicle is to be parked must be of a minimum size of 4.8 metres (16ft) in length by 2.4 metres (8ft) in width”
lbhf.gov.uk, checked 16 November 2026
Other layout rules
Parking area at least 4.8m long by 2.4m wide. Not approved within 10m of a junction, zigzag road markings or any crossing points. Garden gates must not open on to the public footway. Crossovers are built with a crossfall towards the road between 1-in-30 and 1-in-40.
Trees
a crossover will not be approved if installation requires the removal of a healthy street tree
Lamp posts and street furniture
There must be 1m minimum clearance from crossover to lamp column. If relocation is approved the cost is added to the estimate (rough cost for relocating a column is £3,500).
When the council says you need planning permission
- Creating an access on to a classified (main) road
- Demolishing a boundary wall more than one metre high in a Conservation Area
- The property is not a single family dwelling house (such as flats or other uses)
Check your driveway against these rules
Enter your measurements to check them against London Borough of Hammersmith & Fulham's rules.
- Depth of your drivewayEnter your depth to check
The council's minimum is 4.8m.
“the area on which the vehicle is to be parked must be of a minimum size of 4.8 metres (16ft) in length by 2.4 metres (8ft) in width”
lbhf.gov.uk, checked 16 November 2026 - Classified (A, B or C) roadTell us if this applies to you
“Creating an access on to a classified (main) road”
lbhf.gov.uk, checked 16 November 2026 - Conservation area or listed buildingTell us if this applies to you
“Demolishing a boundary wall more than one metre high in a Conservation Area”
lbhf.gov.uk, checked 16 November 2026
Applying to Hammersmith and Fulham
- Who builds it
- The council's own contractor builds itlbhf.gov.uk, checked 16 November 2026
- How long it takes
- Utility companies take an average of six weeks to reply with an estimate of the cost of any alterations; works would normally be completed within six weeks of receipt and clearance of the deposit payment.lbhf.gov.uk, checked 16 November 2026
Sources
Every page we used from London Borough of Hammersmith & Fulham's website, checked on 16 November 2026.
- https://www.lbhf.gov.uk/transport-and-roads/roads-bridges-and-pavements/applying-vehicle-crossover
- https://democracy.lbhf.gov.uk/documents/s133739/Appendix%20E%20Fees%20and%20charges.pdf
- https://democracy.lbhf.gov.uk/documents/s133641/Appendix%204%20EASPR%20Fees%20and%20Charges%20Exceptions%2026-27.pdf
- https://democracy.lbhf.gov.uk/documents/s130464/Appendix%20E%20-%20Fees%20and%20Charges%20v2.pdf