Dropped kerbs in Fife
What Fife Council charges, its rules for driveways, and where to apply.
Tap a figure for its source, fee year and the date we checked it.
Fife's fees
Fife Council
A contractor you choose builds it, with a licence from the council
You pay at least£112
The council doesn't say whether VAT is included.
Plus
- Building the dropped kerb: not published by the council
- Application fee£112
- Per application
- VAT not stated
fife.gov.uk, checked 16 November 2026 · No fee year statedThe council's words
“£112 paid online at the end of this form using a credit/debit card.”
- Building the dropped kerbNot published by the council
Refunds
The council doesn't say whether the application fee is refunded.
Fife's rules
Depth of your driveway
Not published by the council
Maximum width
Council limit: 3.5m, the council doesn't say where it is measured.
The council's words
“The maximum width of the access shall be no greater than 3.50m unless specifically permitted by agreement with Fife Council.”
fife.gov.uk, checked 16 November 2026
Other layout rules
Maximum access width 3.50m unless agreed with the council. The existing footway shall be re-graded to form the crossing over the full width and across the full length of the crossing.
When the council says you need planning permission
- Access onto a classified road rather than a street
- Example given: living in a block of 4 flats
Check your driveway against these rules
Enter your measurements to check them against Fife Council's rules.
- Depth of your drivewayNot published by the council
- Maximum widthEnter your width to check
Council limit: 3.5m, the council doesn't say where it is measured.
“The maximum width of the access shall be no greater than 3.50m unless specifically permitted by agreement with Fife Council.”
fife.gov.uk, checked 16 November 2026 - Classified (A, B or C) roadTell us if this applies to you
“Access onto a classified road rather than a street”
fife.gov.uk, checked 16 November 2026
Applying to Fife
- Who builds it
- A contractor you choose builds it, with a licence from the councilfife.gov.uk, checked 16 November 2026
- How long it takes
- No decision time stated. 2 weeks notice must be given prior to the proposed work start date.fife.gov.uk, checked 16 November 2026
Sources
Every page we used from Fife Council's website, checked on 16 November 2026.
- https://www.fife.gov.uk/business/licences-and-permits-for-business/road-and-pavement-permits/apply-for-a-dropped-kerb
- https://www.fife.gov.uk/business/licences-and-permits-for-business/road-and-pavement-permits
- https://fife.gov.uk/services/form-pages/apply-for-a-dropped-kerb
- https://www.fife.gov.uk/__data/assets/pdf_file/0017/422711/Vehicle_Access_Specification_Guidance_Sheet.pdf
- https://www.fife.gov.uk/roads-travel-parking/roads-and-pavements/driveway-obstruction