Dropped kerbs in East Sussex
What East Sussex County Council charges, its rules for driveways, and where to apply.
- Min. depth
- 5m
Tap a figure for its source, fee year and the date we checked it.
East Sussex's fees
East Sussex County Council
A contractor from the council's approved list builds it
You pay at least£411
The council doesn't say whether VAT is included.
Plus
- Building the dropped kerb: not published by the council
- Application fee£411
- Per licence (6 months)
- VAT not stated
eastsussex.gov.uk, checked 15 November 2026 · Fee year 2026-27The council's words
“S184 Vehicle crossover licence (Duration: 6 months)”
- Building the dropped kerbNot published by the council
Refunds
The application fee is not refunded if your application is refused.
The council's words
“If your application is refused, you will receive correspondence explaining the reason for the refusal. No refunds are given based on the decision.”
Other charges the council lists
These may or may not apply to you, so they aren't in the total.
- Licence renewal (6 months)£147
- Per renewal
- VAT not stated
live.eastsussexhighways.com, checked 15 November 2026 · No fee year statedThe council's words
“Renewal 6 months 147.00”
East Sussex's rules
Depth of your driveway
The council's minimum is 5m.
The council's words
“at least 5 m long between the back of the pavement or property boundary”
live.eastsussexhighways.com, checked 15 November 2026
Other layout rules
No maximum width stated; a standard crossing 'will normally be ... 4 dropped kerbs and a ramped kerb either side (6 kerbs, measuring 5.4m total)'. Depth 6m where parking is in front of a garage or door; parking space minimum 2.5m wide, at right angles to the highway, enter/exit in one movement; no overhang. Major road: refused if closer than 15m to a junction; corner plots on minor road. Visibility: X 2.0m, Y from 33m (20mph) to 120m (40mph A road); footway splay 2.0m x 2.0m. Max crossover gradient 1:12 (8%), recommended 1:20. Surface water must not flow onto highway. No loose driveway material within 6m of highway; demarcation kerb required. Gates must not open outwards; set back 5m on busy roads. Second access not normally approved. Vehicles over 3.5t need enhanced crossing. Works not permitted until driveway/hardstanding built.
Trees
Applications requiring removal of a highway tree are likely to be refused. Minimum root protection area radius (m) = stem diameter (mm) at 1.5m x 0.012 (may be reduced on arboriculturist advice). Trees generally not removed; applicant may have to fund additional works such as exposing roots for assessment.
Lamp posts and street furniture
Street furniture, lamp columns and utility plant must be at least 1.5m from the top of the ramped kerb; anything within 1.5m must be relocated at the applicant's expense (subject to consulting affected neighbours). Applicant also pays any utility apparatus alterations.
Driving over the kerb without permission
ESH says it has legal powers under Section 184 of the Highways Act 1980 to insist on a vehicle crossover. Unlawfully opening the highway is an offence under s131 and s133 Highways Act 1980. Crossovers built by an unauthorised contractor are deemed illegal. If vehicles overhang/park on the crossing, householders are notified and ESH may remove the access and recharge costs; any licence breach lets the authority stop up the access and recover costs.
When the council says you need planning permission
- Access connects onto a classified road (A, B or C class)
- Property is in a conservation area
- Surface water run-off from the new driveway is not retained within the property curtilage
See all 4 conditions
- Impermeable/non-porous paving over 5 square metres (no longer permitted development)
Check your driveway against these rules
Enter your measurements to check them against East Sussex County Council's rules.
- Depth of your drivewayEnter your depth to check
The council's minimum is 5m.
“at least 5 m long between the back of the pavement or property boundary”
live.eastsussexhighways.com, checked 15 November 2026 - Classified (A, B or C) roadTell us if this applies to you
“Access connects onto a classified road (A, B or C class)”
live.eastsussexhighways.com, checked 15 November 2026 - Conservation area or listed buildingTell us if this applies to you
“Property is in a conservation area”
live.eastsussexhighways.com, checked 15 November 2026
Applying to East Sussex
- Who builds it
- A contractor from the council's approved list builds itlive.eastsussexhighways.com, checked 15 November 2026
- How long it takes
- 'it can take up to 8 weeks to determine your application.' Licence valid 6 months; contractor must give minimum 14 days' notice (21 days if multi-phase traffic control) for phase 2.live.eastsussexhighways.com, checked 15 November 2026
- Approved contractors
- The council's list
Sources
Every page we used from East Sussex County Council's website, checked on 15 November 2026.
- https://live.eastsussexhighways.com/application-forms/vehicle-dropped-crossing-s184
- https://live.eastsussexhighways.com/application-forms/vehicle-dropped-crossing-s184/2
- https://live.eastsussexhighways.com/application-forms/vehicle-dropped-crossing-s184/3
- https://live.eastsussexhighways.com/application-forms/vehicle-dropped-crossing-s184/4
- https://live.eastsussexhighways.com/application-forms/vehicle-dropped-crossing-s184/5
- https://live.eastsussexhighways.com/application-forms/licence-fees
- https://live.eastsussexhighways.com/application-forms/licence-terms-conditions/6
- https://live.eastsussexhighways.com/application-forms/list-approved-contractors
- https://www.eastsussex.gov.uk/parking/enforcement/form-apm
- https://www.eastsussex.gov.uk/your-council/finance/charging
- https://www.eastsussex.gov.uk/media/3irf4wke/fees-and-charges-approved-february-2026.xlsx
- https://www.eastsussex.gov.uk/parking/permits
- https://www.eastsussex.gov.uk/parking/permits/waivers