Dropped kerbs in East Ayrshire

What East Ayrshire Council charges, its rules for driveways, and where to apply.

Works licence
£318
Min. depth
5.5m

Tap a figure for its source, fee year and the date we checked it.

Work out my costs

East Ayrshire's fees

Along the kerb, including the sloping kerbs at each end. Optional.
Crossing width × pavement width, if you know it. Optional.
Anything else?

East Ayrshire Council

A contractor you choose builds it, with a licence from the council

You pay at least£318

The council doesn't say whether VAT is included.

Plus

  • Application fee: not published by the council
  • Building the dropped kerb: priced by quote
  • Application fee
    Not published by the council
  • Works licence or permit
    £318
    • Per permit, every four weeks
    • VAT not stated
    • Paid by your contractor (usually passed on in their price).
    ayrshireroadsalliance.org, checked 15 November 2026 · No fee year stated
    The council's words
    “Road Opening Permit (East Ayrshire) £318 every four weeks”
  • Building the dropped kerb
    Priced by quote

Refunds

The council doesn't say whether the application fee is refunded.

East Ayrshire's rules

  • Depth of your driveway

    The council's minimum is 5.5m.

    The council's words
    “Typically, this requires a minimum parking space length of 6.0m (or minimum 5.5m) measured from the back of the footway/property boundary to the front of your house or garage.”
    ayrshireroadsalliance.org, checked 15 November 2026

Other layout rules

The off-street parking area must be big enough that no part of a parked vehicle overhangs the footway or road; typically a parking space length of 6.0m (minimum 5.5m) from the back of footway/property boundary to the house or garage. A relaxation may be considered for existing residential properties only, case by case, if scaled plans show vehicles parked perpendicular, angled or parallel are fully inside the boundary (not for new developments, car parks or parking courts). Access at least 10 metres from a road junction. Drivers must be able to leave in forward gear (no reversing onto the road). A second access crossing may not be permitted if an existing access already serves the property. Domestic EV charging equipment should be at least 2.5m from electrically supplied street furniture.

ayrshireroadsalliance.org, checked 15 November 2026

Trees

The access position should ideally avoid obstacles such as street furniture or trees; if that is not feasible, the Roads Authority decides whether the item should or can be removed or relocated. The applicant pays the full cost of the work, including street furniture adjustments.

ayrshireroadsalliance.org, checked 15 November 2026

Lamp posts and street furniture

The access position should ideally avoid street furniture (lighting columns, signs, utility covers) or trees; if not feasible, the Roads Authority decides whether the item should or can be removed or relocated. The applicant is responsible for the full cost of the associated street furniture adjustments.

ayrshireroadsalliance.org, checked 15 November 2026

When the council says you need planning permission

  • Footway crossing on an A Class, B Class or C Class numbered road (planning permission from East Ayrshire Council as Planning Authority must be obtained first)
ayrshireroadsalliance.org, checked 15 November 2026

Check your driveway against these rules

From your house to the back of the pavement.
The same width as in the cost calculator above.
Type of crossing
Is your house on a classified road (an A, B or C road)?
Is it in a conservation area, or a listed building?

Enter your measurements to check them against East Ayrshire Council's rules.

  • Depth of your drivewayEnter your depth to check

    The council's minimum is 5.5m.

    “Typically, this requires a minimum parking space length of 6.0m (or minimum 5.5m) measured from the back of the footway/property boundary to the front of your house or garage.”
    ayrshireroadsalliance.org, checked 15 November 2026

Applying to East Ayrshire

Who builds it
A contractor you choose builds it, with a licence from the council
ayrshireroadsalliance.org, checked 15 November 2026
How long it takes
No decision time stated for the footway crossing application (ARA assesses the site after an application). The contractor's Road Opening Permit application should be submitted at least 15 working days (21 calendar days) before the requested start date.
ayrshireroadsalliance.org, checked 15 November 2026

Apply on the council's website

Sources

Every page we used from East Ayrshire Council's website, checked on 15 November 2026.