Dropped kerbs in Derby
What Derby City charges, its rules for driveways, and where to apply.
- Min. depth
- 4.8m
Tap a figure for its source, fee year and the date we checked it.
Derby's fees
Derby City
You use your own contractor
You pay at least£175
The council doesn't say whether VAT is included.
Plus
- Building the dropped kerb: your contractor's price
- Application fee£175
- Per application
- VAT not stated
derby.gov.uk, checked 15 November 2026 · No fee year statedThe council's words
“There is also a £175 non-refundable fee to process the application.”
- Building the dropped kerbYour contractor's price
Refunds
The application fee is not refunded if your application is refused.
The council's words
“There is also a £175 non-refundable fee to process the application.”
Other charges the council lists
These may or may not apply to you, so they aren't in the total.
- Repaint worn Protective Entrance Marking£125
- Per repaint (after approval)
- VAT not stated
derby.gov.uk, checked 15 November 2026 · No fee year statedThe council's words
“Repainting a worn PEM marking - £125”
Derby's rules
Depth of your driveway
The council's minimum is 4.8m.
The council's words
“the measurements of a hardstanding should be a minimum of 4.8m length and 2.4m width”
derby.gov.uk, checked 15 November 2026
Other layout rules
Hardstanding min 4.8m long x 2.4m wide; 6m long if the space is in front of a door or garage. Car must park lengthways at 90 degrees to the highway; no parallel parking unless the vehicle can drive on and off at 90 degrees in a single safe manoeuvre. No stone/gravel driveways; gates must open inwards; hardstanding must be built before the crossing and levels fixed on the private side (no ramps on the footway). May be refused on a junction, brow of a hill, bus stop, where visibility is poor, or for planning reasons. Kerbs: drop kerbs with a single taper kerb each side. No crossover width limits stated.
Trees
If a highway tree is near the proposed access, advice must be sought from the council's Arboricultural officers (trees@derby.gov.uk) before applying; this could lead to refusal. Damage to highway trees is recharged.
Lamp posts and street furniture
Vehicular access must be at least one metre from any street lighting column; a nearby column could lead to refusal. Applicant must serve 29-day notice on the utilities and pays for any diversion/protection works.
Driving over the kerb without permission
It is against the law to drive over a public footway without an authorised vehicle crossing. The council will take action where a crossing has been installed illegally and may instruct the owner (whoever did the work) to return the highway to its former condition.
When the council says you need planning permission
- New crossing on a Classified Road (A, B or C roads) - householder planning application needed in advance
- Hard surface of more than five square metres between the front of the property and the highway that is non-porous and does not drain to a permeable area within the property
- Other than minor estate roads, planning permission may be required (contact Planning Development Control)
See all 4 conditions
- Conservation areas: applicant must inform Planning Development Control; natural materials to match existing
Check your driveway against these rules
Enter your measurements to check them against Derby City's rules.
- Depth of your drivewayEnter your depth to check
The council's minimum is 4.8m.
“the measurements of a hardstanding should be a minimum of 4.8m length and 2.4m width”
derby.gov.uk, checked 15 November 2026 - Classified (A, B or C) roadTell us if this applies to you
“New crossing on a Classified Road (A, B or C roads) - householder planning application needed in advance”
derby.gov.uk, checked 15 November 2026 - Conservation area or listed buildingTell us if this applies to you
“Conservation areas: applicant must inform Planning Development Control; natural materials to match existing”
derby.gov.uk, checked 15 November 2026
Applying to Derby
- Who builds it
- A contractor you choose builds it, with a licence from the council. Or the council's own contractor builds it.derby.gov.uk, checked 15 November 2026
- How long it takes
- Option 2 (council builds): quote valid six weeks; about 14 weeks from payment to completion. Option 1: utilities' responses to the 29-day notice are valid three months, so works must be completed within three months of approval; one week's notice before starting. No decision time stated.derby.gov.uk, checked 15 November 2026
Sources
Every page we used from Derby City's website, checked on 15 November 2026.
- https://www.derby.gov.uk/transport-and-streets/roads-highways-pavements/vehicle-access-kerbs/
- https://www.derby.gov.uk/media/derbycitycouncil/contentassets/documents/transport/va-application-pack-2025.docx
- https://www.derby.gov.uk/transport-and-streets/roads-highways-pavements/protective-entrance-marking/
- https://www.derby.gov.uk/transport-and-streets/roads-highways-pavements/street-parking-pavements/
- https://www.derby.gov.uk/transport-and-streets/parking-in-derby/
- https://www.derby.gov.uk/transport-and-streets/parking-in-derby/parking-permits/
- https://www.derby.gov.uk/transport-and-streets/parking-in-derby/parking-permits/parking-permit-prices/
- https://www.derby.gov.uk/council-and-democracy/open-data-freedom-of-information/publication-scheme/what-we-spend-how-we-spend-it/