Dropped kerbs in Darlington

What Darlington Borough Council charges, its rules for driveways, and where to apply.

Application
£150
own contractor
Application
£25
council builds

Tap a figure for its source, fee year and the date we checked it.

Work out my costs

Darlington's fees

Who builds it?
Along the kerb, including the sloping kerbs at each end. Optional.
Crossing width × pavement width, if you know it. Optional.
Anything else?

Darlington Borough Council

You use your own contractor

You pay at least£150

The council doesn't say whether VAT is included.

Plus

  • Building the dropped kerb: your contractor's price
  • Application fee
    £150
    • Per vehicle crossing (single domestic dwelling)
    • VAT not stated
    darlington.gov.uk, checked 16 November 2026 · No fee year stated
    The council's words
    “single domestic dwelling £150”
  • Building the dropped kerb
    Your contractor's price

Refunds

The council's refund terms don't fit a single figure for the application fee. See the council's words below.

darlington.gov.uk, checked 16 November 2026 · No fee year stated
The council's words
“refunded the full amount less £25 to cover administrative costs incurred”

Other charges the council lists

These may or may not apply to you, so they aren't in the total.

  • S184 licence fee - multiple domestic dwellings, commercial and industrial
    £300
    • Per vehicle crossing
    • VAT not stated
    darlington.gov.uk, checked 16 November 2026 · No fee year stated
    The council's words
    “multiple domestic dwellings, commercial and industrial £300”
  • Administrative deduction from refund if S184 application is declined
    £25
    • Per declined application
    • VAT not stated
    darlington.gov.uk, checked 16 November 2026 · No fee year stated
    The council's words
    “refunded the full amount less £25 to cover administrative costs”

Darlington's rules

  • Depth of your driveway

    Not published by the council

Other layout rules

Most common reasons for declining: close proximity to a junction; gradient too steep leading to cars grounding; inadequate parking area within the property. Applicant confirms that a parked vehicle will on no account be permitted to overhang the highway. Crossing must be built to the council's drawing and specification (or a council-approved design). No metric width or depth limits stated.

darlington.gov.uk, checked 16 November 2026

Trees

Close proximity of a highway tree is listed among the most common reasons for declining an application. Applicant must give distances to nearby trees on the form.

darlington.gov.uk, checked 16 November 2026

Lamp posts and street furniture

Close proximity of a street lighting column or BT pole is listed among the most common reasons for declining. Applicant must give distances to nearby lamp columns and BT poles; statutory undertakers must be contacted before works.

darlington.gov.uk, checked 16 November 2026

When the council says you need planning permission

  • Road is a classified road (the page lists Darlington's classified roads) - planning permission may be needed
  • Confirmation of planning approval required with the S184 application where required; traffic management plan needed for works on a classified road
darlington.gov.uk, checked 16 November 2026

Check your driveway against these rules

From your house to the back of the pavement.
The same width as in the cost calculator above.
Type of crossing
Is your house on a classified road (an A, B or C road)?
Is it in a conservation area, or a listed building?

Darlington Borough Council doesn't publish measured rules for depth or width. Ask the council before you apply.

  • Depth of your drivewayNot published by the council
  • Classified (A, B or C) roadTell us if this applies to you
    “Road is a classified road (the page lists Darlington's classified roads) - planning permission may be needed”
    “Confirmation of planning approval required with the S184 application where required; traffic management plan needed for works on a classified road”
    darlington.gov.uk, checked 16 November 2026

Applying to Darlington

Who builds it
A contractor you choose builds it, with a licence from the council. Or the council builds it.
darlington.gov.uk, checked 16 November 2026
How long it takes
Page: licence requests and estimate requests 'could take up to 10 weeks'; council-built crossings could take up to four months (utility checks). S184 form: 'We will require 10 working days to process the licence', then street works notice periods (3 working days minor, 10 working days standard, 3 months major). Approval valid 36 months.
darlington.gov.uk, checked 16 November 2026

Apply on the council's website

Sources

Every page we used from Darlington Borough Council's website, checked on 16 November 2026.