Dropped kerbs in Clackmannanshire

What Clackmannanshire Council charges, its rules for driveways, and where to apply.

Application
£51.40
2026-27

Tap a figure for its source, fee year and the date we checked it.

Work out my costs

Clackmannanshire's fees

Along the kerb, including the sloping kerbs at each end. Optional.
Crossing width × pavement width, if you know it. Optional.
Anything else?

Clackmannanshire Council

A contractor you choose builds it, with a licence from the council

You pay at least£51.40

The council doesn't say whether VAT is included.

Plus

  • Building the dropped kerb: priced by quote
  • Application fee
    £51.40
    • Per footway crossing consent
    • VAT not stated
    clacks.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “Footway Crossing – Minor Roadworks Consent £51.40”
  • Building the dropped kerb
    Priced by quote

Refunds

The council doesn't say whether the application fee is refunded.

Other charges the council lists

These may or may not apply to you, so they aren't in the total.

  • Access protection marking - remarking (refresh existing white line)
    £51.40
    • Per refresh of existing marking
    • VAT not stated
    clacks.gov.uk, checked 15 November 2026 · Fee year 2026-27
    The council's words
    “Access Protection Marking - Remarking £51.40”

Clackmannanshire's rules

  • Depth of your driveway

    Not published by the council

Other layout rules

The MRC guidance notes include a 'Vehicular Footway Crossing' standard drawing: footway dished with no abrupt change of slope and a maximum gradient of 10%, PC transition kerbs and splay kerbs to BS 7263. Work must follow the Clackmannanshire Council Development Roads Guidelines and Specification. No openings longer than 30 metres in the carriageway or footway. No frontage depth or maximum width stated.

clacks.gov.uk, checked 15 November 2026

Driving over the kerb without permission

MRC guidance: 'it is an offence to carry out any works within a public road without permission', and the Roads Authority can remove or fill in unauthorised works and recover its reasonable costs from the person responsible.

clacks.gov.uk, checked 15 November 2026

When the council says you need planning permission

  • Proposed access is taken from a classified route (planning consent needed before applying for the crossing)
clacks.gov.uk, checked 15 November 2026

Check your driveway against these rules

From your house to the back of the pavement.
The same width as in the cost calculator above.
Type of crossing
Is your house on a classified road (an A, B or C road)?
Is it in a conservation area, or a listed building?

Clackmannanshire Council doesn't publish measured rules for depth or width. Ask the council before you apply.

  • Depth of your drivewayNot published by the council
  • Classified (A, B or C) roadTell us if this applies to you
    “Proposed access is taken from a classified route (planning consent needed before applying for the crossing)”
    clacks.gov.uk, checked 15 November 2026

Applying to Clackmannanshire

Who builds it
A contractor you choose builds it, with a licence from the council
clacks.gov.uk, checked 15 November 2026
How long it takes
Permits/consents 'will usually be issued within 1-4 weeks' depending on complexity and accuracy of the application. MRC applications must be submitted at least 14 days before the proposed start (at least 1 month in traffic-sensitive situations). Consent holders must give 24 hours' notice before starting.
clacks.gov.uk, checked 15 November 2026

Apply on the council's website

Sources

Every page we used from Clackmannanshire Council's website, checked on 15 November 2026.