Dropped kerbs in Bury
What Bury Metropolitan Borough Council charges, its rules for driveways, and where to apply.
Tap a figure for its source, fee year and the date we checked it.
Bury's fees
Bury Metropolitan Borough Council
The council builds it
You pay at least£85
The council doesn't say whether VAT is included.
Plus
- Building the dropped kerb: priced by quote
- Application fee£85
- Per application (administration and site assessment)
- VAT not stated
bury.gov.uk, checked 15 November 2026 · No fee year statedThe council's words
“A non-returnable deposit of £85 is required. The fee covers the cost of administration and a site assessment”
- Building the dropped kerbPriced by quote
Refunds
The application fee is not refunded if your application is refused.
The council's words
“A non-returnable deposit of £85 is required. The fee covers the cost of administration and a site assessment”
Other charges the council lists
These may or may not apply to you, so they aren't in the total.
- Access protection marking application and assessment fee£50
- Per application (non-refundable)
- VAT not stated
bury.gov.uk, checked 15 November 2026 · No fee year statedThe council's words
“£50 (non-refundable) for application and assessment, plus £105 for installation”
Bury's rules
Depth of your driveway
The council's minimum is 5m.
The council's words
“Your driveway must be a minimum length of 5 metres from the where your drive meets the pavement.”
bury.gov.uk, checked 15 November 2026Maximum width
Council limit: 4.5m, measured along the kerb.
The council's words
“The maximum size of a dropped crossing is 4.5 metres. This is the equivalent of 5 dropped kerbstones outside one property.”
bury.gov.uk, checked 15 November 2026
Other layout rules
Must already have (or plan) a driveway; driveway at least 5m long from where it meets the pavement (longer in some circumstances), at least 3.1m wide, gradient less than 10%. Standard crossing width 2.7m, maximum 4.5m (5 kerbstones). May be refused if on a bend or at a junction, near traffic signals, with a steep slope between garden and road, insufficient garden area or insufficient visibility. A Legal Land Easement is needed if the crossing crosses land that is not dedicated highway. The council may alter the crossing later to accommodate neighbouring crossings.
Trees
A highway tree in the pavement 'would not normally be removed to provide a dropped kerb'; a tree in the proposed crossing may prevent approval.
Lamp posts and street furniture
Streetlights can in most cases be relocated to allow driveways to be widened, but all costs are borne by the householder (quotation after site inspection). Costs of lowering or moving utility apparatus (water, gas, cables) are met by the applicant.
When the council says you need planning permission
- Property is on a classified road
- Property is in a conservation area
- Property is a listed building
See all 4 conditions
- Access for a commercial or apartment building
Check your driveway against these rules
Enter your measurements to check them against Bury Metropolitan Borough Council's rules.
- Depth of your drivewayEnter your depth to check
The council's minimum is 5m.
“Your driveway must be a minimum length of 5 metres from the where your drive meets the pavement.”
bury.gov.uk, checked 15 November 2026 - Maximum widthEnter your width to check
Council limit: 4.5m, measured along the kerb.
“The maximum size of a dropped crossing is 4.5 metres. This is the equivalent of 5 dropped kerbstones outside one property.”
bury.gov.uk, checked 15 November 2026 - Classified (A, B or C) roadTell us if this applies to you
“Property is on a classified road”
bury.gov.uk, checked 15 November 2026 - Conservation area or listed buildingTell us if this applies to you
“Property is in a conservation area”
“Property is a listed building”
bury.gov.uk, checked 15 November 2026
Applying to Bury
- Who builds it
- The council builds itbury.gov.uk, checked 15 November 2026
- How long it takes
- 'we aim to complete assessments within 28 working days.' Works are done in batches; 'we aim to complete two batches of vehicular crossing works per year', with at least 24 hours' notice of the start date.bury.gov.uk, checked 15 November 2026
Sources
Every page we used from Bury Metropolitan Borough Council's website, checked on 15 November 2026.
- https://www.bury.gov.uk/roads-travel-and-parking/highways-keep-bury-moving/dropped-kerbs
- https://www.bury.gov.uk/roads-travel-and-parking/highways-keep-bury-moving/access-protection-markings
- https://www.bury.gov.uk/roads-travel-and-parking/parking/apply-for-a-parking-permit
- https://www.bury.gov.uk/roads-travel-and-parking/parking/apply-for-a-parking-permit/resident-parking-scheme-permits