Dropped kerbs in Brent
What London Borough of Brent charges, its rules for driveways, and where to apply.
- Min. depth
- 4.8m
Tap a figure for its source, fee year and the date we checked it.
Brent's fees
London Borough of Brent
The council builds it
You pay at least£200
Figures are before VAT.
Plus
- Building the dropped kerb: priced by quote
- Application fee£200
- Per application
- Plus VAT
democracy.brent.gov.uk, checked 15 November 2026 · Fee year 2026-27The council's words
“Non-refundable admin charge Domestic Vehicle Crossing £200.00”
- Building the dropped kerbPriced by quote
Refunds
The application fee is not refunded if your application is refused.
The council's words
“Non-refundable admin charge Domestic Vehicle Crossing £200.00”
Other charges the council lists
These may or may not apply to you, so they aren't in the total.
- Legal agreement (short frontage 3.8m-4.8m)From £500
- Per legal agreement
- VAT not stated
brent.gov.uk, checked 15 November 2026 · No fee year statedThe council's words
“Applicants requiring legal agreements will be charged a fee of £500 by way of legal costs”
Brent's rules
Depth of your driveway
The council's minimum is 4.8m.
The council's words
“A vehicle hardstanding should therefore normally be at least 4.8 metres deep by 2.4 metres wide”
brent.gov.uk, checked 15 November 2026Maximum width
Council limit: 4.2m, measured at your property boundary.
The council's words
“the maximum crossover width should not normally exceed 4.2 metres at the back of the footway.”
brent.gov.uk, checked 15 November 2026Maximum width (shared crossing)
Council limit: 4.2m, the council doesn't say where it is measured.
The council's words
“the total crossover width for each property, measured to the centre line of the shared access, should not exceed 4.2 metres”
brent.gov.uk, checked 15 November 2026
Other layout rules
Hardstanding normally 4.8m x 2.4m at 90 degrees to road; frontages 3.8m-4.8m deep accepted only with a legal agreement restricting vehicle size (legal fee £500); no parallel bays. Minimum single crossover 2.4m, increased to 2.7/3.1/3.6m where highway turning space is 5.5/5.0/4.5m. Total crossover width normally max 50% of frontage; shared access max 4.2m per property. Gradient of forecourt or crossover no steeper than 1 in 10. 600mm level platform between adjacent dropped kerbs. One crossover per property (second only if frontage at least 12m and further conditions). Visibility splays 2m x 2m (footway). Grass verges over 3m deep refused. Crossover sited to side of frontage. Retain 50% soft landscaping (30% for frontages under 8.4m wide); permeable hardstanding, drainage channel at threshold to a soakaway of at least 1 cubic metre; no loose gravel under 20mm. In a CPZ not permitted if more than one resident bay space is lost. Gates must not open outward.
Trees
Crossovers not normally allowed where they require removal of, or cutting roots of, a street tree; arboriculture team permission needed. Street trees generally removed only if dead, diseased, dying, at end of life or in exceptional circumstances; where removal is agreed the applicant pays for removal and replacement elsewhere.
Lamp posts and street furniture
Crossover location should be altered to avoid signs, lamp columns, trees, utility apparatus; if not feasible the relevant department decides whether it can be moved. All costs of removing/relocating street furniture, utility apparatus or road markings (including fire hydrants, telegraph poles, traffic order changes) are paid by the applicant.
Driving over the kerb without permission
Policy says it is illegal to drive across the footway without a constructed crossing (s184 Highways Act 1980). Council monitors complaints: initial warning letter, then penalty notice and fine where appropriate. May serve a s16 London Local Authorities and Transport for London Act 2003 notice giving at least 28 days to stop, then carry out works to prevent access (e.g. bollards) and recover costs; bollard removal for a later application is at applicant's cost. Overhanging vehicles also enforced. Unauthorised construction by others than the council's contractors is an offence.
When the council says you need planning permission
- Classified road (A or B road)
- Major road such as the North Circular Road (A406)
- Any other road on the council's published list of roads requiring planning permission (includes slip/service roads sharing the main road's name)
See all 7 conditions
- Flat, maisonette or any building that is not a single-family dwelling
- Listed building
- Conservation area (Article 4 controls); consent also needed to demolish gate/wall/fence/railings over 1m next to highway
- Paving with impermeable material over 5 sq m or where surface water will not drain into the front garden
Check your driveway against these rules
Enter your measurements to check them against London Borough of Brent's rules.
- Depth of your drivewayEnter your depth to check
The council's minimum is 4.8m.
“A vehicle hardstanding should therefore normally be at least 4.8 metres deep by 2.4 metres wide”
brent.gov.uk, checked 15 November 2026 - Maximum widthEnter your width to check
Council limit: 4.2m, measured at your property boundary.
“the maximum crossover width should not normally exceed 4.2 metres at the back of the footway.”
brent.gov.uk, checked 15 November 2026 - Classified (A, B or C) roadTell us if this applies to you
“Classified road (A or B road)”
“Any other road on the council's published list of roads requiring planning permission (includes slip/service roads sharing the main road's name)”
brent.gov.uk, checked 15 November 2026 - Conservation area or listed buildingTell us if this applies to you
“Listed building”
“Conservation area (Article 4 controls); consent also needed to demolish gate/wall/fence/railings over 1m next to highway”
brent.gov.uk, checked 15 November 2026
Applying to Brent
- Who builds it
- The council builds itbrent.gov.uk, checked 15 November 2026
- How long it takes
- 'Crossovers are usually constructed within six weeks' of full payment (policy: aims to construct within 6 weeks of payment). Legal agreement for short frontages: 4 to 6 weeks processing after documents received.brent.gov.uk, checked 15 November 2026
Sources
Every page we used from London Borough of Brent's website, checked on 15 November 2026.
- https://www.brent.gov.uk/parking-roads-and-travel/roads-and-streets/vehicle-crossings-and-dropped-kerb
- https://www.brent.gov.uk/-/media/files/resident-documents/parking-roads-and-transport-document/vehicle-crossover-policy.pdf
- https://democracy.brent.gov.uk/documents/s155421/Appendix%20L%20ii%20-%20Fees%20and%20Charges%20Schedule.pdf
- https://democracy.brent.gov.uk/documents/s155133/Appendix%20L%20ii%20-%20Fees%20and%20Charges%20Schedule.pdf
- https://www.brent.gov.uk/parking-roads-and-travel/parking/parking-permits
- https://www.brent.gov.uk/parking-roads-and-travel/parking/parking-permits/parking-permit-costs
- https://www.brent.gov.uk/services-for-residents/parking/controlled-parking-zones/
- https://democracy.brent.gov.uk/documents/s20543/3.1%20App%20A%20Vehicle%20Crossover%20Policy%20Revision.pdf